BLD-Final | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | PASS |
Jim Sly
|
|
|
Jessie Phone #: ###-####
|
DOC - Permit Finaled | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Jim Sly
|
|
|
Jesse Phone #: ###-#### frame and energy ok
|
BLD-Wall Bracing | 9/27/2017 | 9/27/2017 | 9/27/2017 | P | PASS |
Jim Sly
|
|
|
shear // Jesse Phone #: ###-####
|
BLD-Foundation | 9/15/2017 | 9/15/2017 | 9/15/2017 | P | PASS |
Jim Sly
|
|
|
Jesse Phone #: ###-####
|
BLD-Footing | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | PASS |
Mike Jordan
|
|
|
Jesse Phone #: ###-####
|
OVERRIDE | | | 9/11/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 9/11/2017 | 9/11/2017 | 9/11/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 9/11/2017 | 9/11/2017 | 9/11/2017 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/11/2017 | | 9/11/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/11/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/11/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 9/11/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/11/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | FAIL |
Brian McGowan
|
|
|
Need notes, dimensions and header/beam sizes.
|
1st review completed | | | 8/22/2017 | | FAIL |
Brian McGowan
|
|
|
Need notes, dimensions and header/beam sizes.
|
Routing - PLAN CHECK | 8/22/2017 | | 8/22/2017 | | FAIL |
Brian McGowan
|
|
|
Need notes, dimensions and header/beam sizes.
|
Application received | | 8/22/2017 | | | |
|
|
|
|