Permit Information
Permit NumberBLD17-03010
StatusFinaled
Name ENERGREEN DEVELOPMENT COMPANY LLC
Site Address 1514 W RIVER ST
Project Name15th & River St Condos Bldg 2
Customer NumberBLD17-03009 EPLAN GRD18-00032
ePlanReviewNo
Description
(2 PERMITS FILED UNDER BLD17-03009 IN EPLANREVIEW)(15TH & RIVER CONDOMINIUMS - BLDG 2) **Permit for the construction of a 3-story 5-unit concrete and wood framed apartment building with work to include general site work and construction of the new building per the approved plans. Special inspections required per attached Form 310. This building is fully fire sprinklered with an NFPA 13-R system. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  4/1/2020 DONE
Zoning Approval3/30/20203/30/20203/30/2020 PASS
DetailsKatelyn Menuge
Owner said will finish sealing corten panels and clean up rust stains.
Temporary Occupancy3/26/20206/24/20203/26/2020 DONE
DetailsGabe Brenner
Print Occupancy Form  3/26/2020 DONE
Print Occupancy Form  3/26/2020 DONE
BLD-Final3/25/20203/25/20203/25/2020PPASS
DetailsDave Hannah
Tim Phone #: ###-####
PubWorks Occupancy Approval3/20/20203/20/20203/20/2020 DONE
DetailsTiffany Lowery
FIRE-Final Inspection3/18/20203/19/20203/19/2020APASS
DetailsJim Page
Previously noted items have been corrected, fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, signature card not available at time of inspection.

Tim Phone #: ###-####
FIRE-Final Inspection3/18/20203/18/20203/18/2020PFAIL
DetailsJim Page
Fire riser room is not a rated room as required by Boise Municipal Code, Chapter 7 Fire Prevention Code section 903.1.2. Provide building permit fire review comments for project, documents are required to be onsite, per conversation with point of contact they are not onsite. Install addressing that is compliant with 2016 IFC section 505, current addressing does not meet the requirements of section 505. Provide corner lot addressing as defined in the BMC Chapter 7 section 505.3. Provide fire extinguishers with current inspection tags for each unit, fire extingiushers can be mounted under the sink. Correct the addressing with the monitoring company.

Tim Phone #: ###-####
Zoning Approval Temp3/16/20203/16/20203/16/2020 PASS
DetailsKatelyn Menuge
Temporary BND20-00064
BLD-Conference3/9/20203/10/20203/10/2020ACANC
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Final3/10/20203/10/20203/10/2020PNR
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Aging Inspection2/13/20202/13/20202/19/2020 PASS
DetailsDave Hannah
BLD-Aging Inspection2/12/20202/12/20202/19/2020 PASS
DetailsDave Hannah
BLD-Energy code compliance10/1/201910/1/201910/1/2019PPASS
DetailsDave Hannah
Tim Phone #: ###-#### this finishs this blg for energy ok to cover
BLD-Energy code compliance9/24/20199/24/20199/24/2019APASS
DetailsDave Hannah
BLD-Wall cover9/23/20199/23/20199/24/2019PPASS
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Framing/Rough-in9/4/20199/4/20199/4/2019PPASS
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Foundation4/25/20194/25/20194/26/2019PPASS
DetailsDave Hannah
Tim Phone #: ###-#### third floor center walls ok
BLD-Foundation4/15/20194/15/20194/16/2019PPART
DetailsDave Hannah
Tim Phone #: ###-#### third floor ext wallsok
BLD-Foundation2/28/20192/28/20192/28/2019PCANC
DetailsBrandon Shaw
Tim Phone #: ###-####
BLD-Foundation2/19/20192/19/20192/19/2019PPART
DetailsDave Hannah
Tim Phone #: ###-#### second floor int walls
BLD-Foundation1/28/20191/28/20191/28/2019PPART
DetailsDave Hannah
Tim Phone #: ###-#### second level ext walls ok
BLD-Footing12/20/201812/21/201812/21/2018APASS
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Foundation12/19/201812/20/201812/20/2018APASS
DetailsDave Hannah
wall-tim Phone #: ###-####
BLD-Foundation11/28/201811/28/201811/28/2018PPART
DetailsDave Hannah
Wall-Tim Phone #: ###-#### second lift ok to place
BLD-Foundation10/16/201810/16/201810/16/2018PPASS
DetailsMike Jordan
Tim-pour time 3:30 Phone #: ###-####
BLD-Foundation10/11/201810/11/201810/11/2018PPASS
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Footing10/2/201810/2/201810/2/2018PPASS
DetailsDave Hannah
tim Phone #: ###-####
Issue PAID IN FULL permit  9/10/2018 DONE
Print Occupancy Form  9/10/2018 DONE
Print Occupancy Form  9/7/2018 DONE
Telephone call  8/28/2018 DONE
Left a message for Greg informing him this permit is 10 days past the expiration date and that is he would like to he may send in a request for one final 180 day extension
Telephone call  8/17/2018 DONE
Left a message for Greg informing that these permits are going to expire tomorrow (5/18/18) at 5pm. Informed that he may send in a 2nd and final extension request for 180 days
Expiration Notice8/6/20188/27/20188/6/2018 DONE
DetailsBrittany Hill
OVERRIDE  8/3/2018  
Plan assigned to (JAR)5/14/20185/14/20188/3/2018 DONE
DetailsJulie Romig
08/03 - 3rd Rev - 1st Rev Comp - 502 15th & River Condominiums (BLD17-03009)
PLANS/APPL TAKEN TO FRONT DESK  8/3/2018 DONE
Permit Ready to Issue  8/3/2018 DONE
ALL MET
NEED
GRD18-00032 NEEDS TO BE ISSUED WITH THIS
RP
GC FORM
REVISED VALUE
Routing Off Site - STRUCTURAL7/30/2018 8/3/2018 PASS
DetailsJulie Romig
Routing PW Street Lights7/30/2018 8/1/2018 PASS
DetailsTom Marshall
Routing - PLAN CHECK7/30/2018 8/1/2018 PASS
DetailsJulie Romig
Routing - PLAN CHECK7/16/2018 7/25/2018 FAIL
DetailsJulie Romig
Routing - Design Review7/16/2018 7/25/2018 PASS
DetailsAndrea Tuning
Routing - PLANNING7/16/2018 7/25/2018 PASS
DetailsLeon Letson
Routing PW Sewer Design7/16/2018 7/25/2018 PASS
DetailsDeAnn Brown
Routing Off Site - STRUCTURAL7/16/2018 7/20/2018 FAIL
DetailsJulie Romig
Route to Impact Fee Review6/27/20186/30/20186/28/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  6/27/2018 FAIL
DetailsJulie Romig
Routing - PLAN CHECK5/14/2018 6/27/2018 FAIL
DetailsJulie Romig
Routing - FIRE5/14/20185/14/20186/13/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - PLANNING5/14/2018 6/7/2018 PASS
DetailsLeon Letson
Routing PW Solid Waste5/14/2018 6/7/2018 PASS
DetailsEvan Carpenter
Routing PW Sewer Design5/14/2018 6/7/2018 FAIL
DetailsDeAnn Brown
Please add tap permit language shown in changemarks on utility plan in eplanreview. Please note property has two existing sewer service lines that were plugged at the property line for demo work. For new taps, these existing services will need to be plugged at the mainline.
Routing PW Street Lights5/14/2018 6/7/2018 PASS
DetailsTom Marshall
Routing PW Drainage5/14/2018 6/7/2018 PASS
DetailsBrian Murphy
Routing - MECHANICAL5/14/2018 6/7/2018 PASS
DetailsTroy James
Routing - Design Review5/14/2018 6/7/2018 PASS
DetailsAndrea Tuning
Routing Off Site - STRUCTURAL5/14/2018 5/24/2018 FAIL
DetailsJulie Romig
Routing - Erosion and Sediment5/14/2018 5/18/2018 PASS
DetailsAndy J. Long
ESC plan with site map and narrative approved. Certified PD, RP to be designated with contract. Site preparation inspection is required.
Routing - PLUMBING5/14/2018 5/15/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Intake Approval  5/14/2018 PASS
Plans ACCEPTED BY PLAN TECH  5/14/2018 DONE
Recd Pcfee & Taken To Pln CK  5/14/2018 DONE
Routing - Addressing5/14/2018 5/14/2018 PASS
DetailsDoug Chausow
Parcel's will be consolidated - address for this permit is 535 S 15th St
Routing - PUBLIC WORKS5/14/2018 5/14/2018 PASS
DetailsRachael Beierle
Extend Review Timeline  1/29/2018 DONE
1st approved 180 day extension per Adele. See documents
Application received  8/23/2017 DONE
Application submitted via PDS Online on Aug 23 2017 9:55AM
First Notice 4/11/2020   
First Notice 4/5/2020