Permanent Occupancy | | | 4/1/2020 | | DONE |
|
|
|
|
Zoning Approval | 3/30/2020 | 3/30/2020 | 3/30/2020 | | PASS |
Katelyn Menuge
|
|
|
Owner said will finish sealing corten panels and clean up rust stains.
|
Temporary Occupancy | 3/26/2020 | 6/24/2020 | 3/26/2020 | | DONE |
Gabe Brenner
|
|
|
|
Print Occupancy Form | | | 3/26/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/26/2020 | | DONE |
|
|
|
|
BLD-Final | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
PubWorks Occupancy Approval | 3/20/2020 | 3/20/2020 | 3/20/2020 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, signature card not available at time of inspection.
Tim Phone #: ###-####
|
FIRE-Final Inspection | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | FAIL |
Jim Page
|
|
|
Fire riser room is not a rated room as required by Boise Municipal Code, Chapter 7 Fire Prevention Code section 903.1.2. Provide building permit fire review comments for project, documents are required to be onsite, per conversation with point of contact they are not onsite. Install addressing that is compliant with 2016 IFC section 505, current addressing does not meet the requirements of section 505. Provide corner lot addressing as defined in the BMC Chapter 7 section 505.3. Provide fire extinguishers with current inspection tags for each unit, fire extingiushers can be mounted under the sink. Correct the addressing with the monitoring company.
Tim Phone #: ###-####
|
Zoning Approval Temp | 3/16/2020 | 3/16/2020 | 3/16/2020 | | PASS |
Katelyn Menuge
|
|
|
Temporary BND20-00064
|
BLD-Conference | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | CANC |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
BLD-Final | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | NR |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
BLD-Aging Inspection | 2/13/2020 | 2/13/2020 | 2/19/2020 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/12/2020 | 2/12/2020 | 2/19/2020 | | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-#### this finishs this blg for energy ok to cover
|
BLD-Energy code compliance | 9/24/2019 | 9/24/2019 | 9/24/2019 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Wall cover | 9/23/2019 | 9/23/2019 | 9/24/2019 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
BLD-Foundation | 4/25/2019 | 4/25/2019 | 4/26/2019 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-#### third floor center walls ok
|
BLD-Foundation | 4/15/2019 | 4/15/2019 | 4/16/2019 | P | PART |
Dave Hannah
|
|
|
Tim Phone #: ###-#### third floor ext wallsok
|
BLD-Foundation | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | CANC |
Brandon Shaw
|
|
|
Tim Phone #: ###-####
|
BLD-Foundation | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PART |
Dave Hannah
|
|
|
Tim Phone #: ###-#### second floor int walls
|
BLD-Foundation | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PART |
Dave Hannah
|
|
|
Tim Phone #: ###-#### second level ext walls ok
|
BLD-Footing | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
BLD-Foundation | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PASS |
Dave Hannah
|
|
|
wall-tim Phone #: ###-####
|
BLD-Foundation | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PART |
Dave Hannah
|
|
|
Wall-Tim Phone #: ###-#### second lift ok to place
|
BLD-Foundation | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Mike Jordan
|
|
|
Tim-pour time 3:30 Phone #: ###-####
|
BLD-Foundation | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
BLD-Footing | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Dave Hannah
|
|
|
tim Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/10/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/10/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/7/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2018 | | DONE |
|
|
|
Left a message for Greg informing him this permit is 10 days past the expiration date and that is he would like to he may send in a request for one final 180 day extension
|
Telephone call | | | 8/17/2018 | | DONE |
|
|
|
Left a message for Greg informing that these permits are going to expire tomorrow (5/18/18) at 5pm. Informed that he may send in a 2nd and final extension request for 180 days
|
Expiration Notice | 8/6/2018 | 8/27/2018 | 8/6/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 8/3/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 5/14/2018 | 5/14/2018 | 8/3/2018 | | DONE |
Julie Romig
|
|
|
08/03 - 3rd Rev - 1st Rev Comp - 502 15th & River Condominiums (BLD17-03009)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/3/2018 | | DONE |
|
|
|
ALL MET
NEED
GRD18-00032 NEEDS TO BE ISSUED WITH THIS
RP
GC FORM
REVISED VALUE
|
Routing Off Site - STRUCTURAL | 7/30/2018 | | 8/3/2018 | | PASS |
Julie Romig
|
|
|
|
Routing PW Street Lights | 7/30/2018 | | 8/1/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLAN CHECK | 7/30/2018 | | 8/1/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 7/16/2018 | | 7/25/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - Design Review | 7/16/2018 | | 7/25/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING | 7/16/2018 | | 7/25/2018 | | PASS |
Leon Letson
|
|
|
|
Routing PW Sewer Design | 7/16/2018 | | 7/25/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing Off Site - STRUCTURAL | 7/16/2018 | | 7/20/2018 | | FAIL |
Julie Romig
|
|
|
|
Route to Impact Fee Review | 6/27/2018 | 6/30/2018 | 6/28/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 6/27/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 5/14/2018 | | 6/27/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 5/14/2018 | 5/14/2018 | 6/13/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLANNING | 5/14/2018 | | 6/7/2018 | | PASS |
Leon Letson
|
|
|
|
Routing PW Solid Waste | 5/14/2018 | | 6/7/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Sewer Design | 5/14/2018 | | 6/7/2018 | | FAIL |
DeAnn Brown
|
|
|
Please add tap permit language shown in changemarks on utility plan in eplanreview. Please note property has two existing sewer service lines that were plugged at the property line for demo work. For new taps, these existing services will need to be plugged at the mainline.
|
Routing PW Street Lights | 5/14/2018 | | 6/7/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 5/14/2018 | | 6/7/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - MECHANICAL | 5/14/2018 | | 6/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 5/14/2018 | | 6/7/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing Off Site - STRUCTURAL | 5/14/2018 | | 5/24/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - Erosion and Sediment | 5/14/2018 | | 5/18/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan with site map and narrative approved. Certified PD, RP to be designated with contract. Site preparation inspection is required.
|
Routing - PLUMBING | 5/14/2018 | | 5/15/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 5/14/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/14/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/14/2018 | | DONE |
|
|
|
|
Routing - Addressing | 5/14/2018 | | 5/14/2018 | | PASS |
Doug Chausow
|
|
|
Parcel's will be consolidated - address for this permit is 535 S 15th St
|
Routing - PUBLIC WORKS | 5/14/2018 | | 5/14/2018 | | PASS |
Rachael Beierle
|
|
|
|
Extend Review Timeline | | | 1/29/2018 | | DONE |
|
|
|
1st approved 180 day extension per Adele. See documents
|
Application received | | | 8/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 23 2017 9:55AM
|
First Notice | | 4/11/2020 | | | |
|
|
|
|
First Notice | | 4/5/2020 | | | |
|
|
|
|