BLD-Final | 3/12/2018 | 3/16/2018 | 3/16/2018 | A | PASS |
Dave Hannah
|
|
|
Final C of O inspection. Key is in the exterior power outlet to the left of the detached garage man door. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
DOC - Permit Finaled | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Tony Young
|
|
|
Energy compliance and insulation inspection for approval to cover. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Energy code compliance | 12/12/2017 | 12/14/2017 | 12/14/2017 | P | PART |
Tony Young
|
|
|
Energy compliance and insulation inspection for approval to cover. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson,, correction posted
|
BLD-Framing/Rough-in | 12/9/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Dave Hannah
|
|
|
Plans are on site under the stairs. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Framing/Rough-in | 12/7/2017 | 12/11/2017 | 12/9/2017 | P | CANC |
Tony Young
|
|
|
Frame Inspection. Shear fix for master bedroom wall has been completed. Engineering is on site. If you would like an electronic copy please let me know. thanks, steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
BLD-Wall Bracing | 11/17/2017 | 11/17/2017 | 11/17/2017 | P | PART |
Tony Young
|
|
|
Shear inspection please. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, need to have revised engineering for change in window layout on north side of home affecting the hold down locations,, ok to cover exterior after finishing the nailing
|
BLD-Foundation | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PASS |
Tony Young
|
|
|
Phone #: ###-####
|
BLD-Foundation | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | PASS |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 10/23/2017 | 10/24/2017 | 10/24/2017 | P | PART |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo ,, work in progress..
|
BLD-Conference | 10/17/2017 | 10/17/2017 | 10/17/2017 | A | DEFR |
Tony Young
|
|
|
EROSION CONTROL site review needed prior to dig. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
OVERRIDE | | | 10/13/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/13/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/13/2017 | | DONE |
Christina Prado
|
|
|
Called Kim to advise permit is ready pending valid RP and gave fees due
|
Issue PAID IN FULL permit | | | 10/13/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/29/2017 | | 10/13/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (M_H) | 9/29/2017 | | 10/13/2017 | | DONE |
Michael Hanson
|
|
|
9/06 sfd L1 paper - 1st review complete waiting for response 10/3 MDH
|
1st review completed | | | 10/13/2017 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 10/13/2017 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/13/2017 | | DONE |
|
|
|
Need
RP
|
Routing - PLANNING | 10/12/2017 | | 10/12/2017 | | PASS |
Jeff Lowe
|
|
|
Reduced size of accessory garage to 489 s.f. O.K. now.
|
Plan resubmittals received | | | 10/10/2017 | | DONE |
|
|
|
Two copies of sheets 2.0, 5.0 and 6.0 taken to Michael
|
Plan assigned to (BJM) | 8/24/2017 | 8/24/2017 | 9/29/2017 | | DEFR |
Brian McGowan
|
|
|
9/06 sfd L1 paper
|
Plan Reviewer's activity | | | 9/29/2017 | | DONE |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 8/24/2017 | | 8/29/2017 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 8/28/2017 | | DONE |
Christina Prado
|
|
|
Received two sets of plan sheets marked 3.2 & 4.2; plans taken to BJM for review
|
Route to Impact Fee Review | 8/24/2017 | 8/27/2017 | 8/25/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/24/2017 | | 8/24/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/24/2017 | | 8/24/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 8/24/2017 | | 8/24/2017 | | FAIL |
Jeff Lowe
|
|
|
garage is 6SF too big to be allowed reduced rear yard setback of 9-feet
|
Plans ACCEPTED BY PLAN TECH | | | 8/24/2017 | | DONE |
|
|
|
|
Intake Approval | | | 8/24/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/24/2017 | | DONE |
|
|
|
|
Application received | | 8/23/2017 | | | |
|
|
|
|