BLD-Final | 7/10/2020 | 7/15/2020 | 7/15/2020 | A | PASS |
Tony Young
|
|
|
screened // Ryan Phone #: ###-####
|
DOC - Permit Finaled | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 7/15/2020 | 7/15/2020 | 7/15/2020 | | DONE |
Ted Vanegas
|
|
|
|
Zoning Approval | 7/15/2020 | 7/15/2020 | 7/15/2020 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Final | 7/8/2020 | 7/9/2020 | 7/9/2020 | A | NR |
Tony Young
|
|
|
Ryan Phone #: ###-####/// need trades 1st
|
BLD-Aging Inspection | 8/29/2019 | 8/29/2019 | 8/30/2019 | | FAIL |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/28/2019 | 8/28/2019 | 8/30/2019 | | FAIL |
Tony Young
|
|
|
|
Change Expiration Date Only | | | 8/5/2019 | | DONE |
Jason Blais
|
|
|
Approval of two 180 day extensions for an issued permit. One from 10/31/18 and second one from 4/16/19.
|
Routing - MECHANICAL | 6/25/2018 | | 6/25/2018 | | PASS |
Troy James
|
|
|
Approved manual j report
|
BLD-Energy code compliance | 5/3/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 4/26/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####,, per plans,, ok to insulate
|
BLD-Wall Bracing | 4/18/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
BLD-Aging Inspection | 3/16/2018 | 3/16/2018 | 3/16/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/15/2018 | 3/15/2018 | 3/16/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Footing | 10/31/2017 | 11/1/2017 | 11/1/2017 | A | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 10/19/2017 | 10/20/2017 | 10/20/2017 | P | CANC |
Tony Young
|
|
|
CANC PER Ryan-would like as late as possible Phone #: ###-####
|
Routing Walk-In (BLD) | 9/11/2017 | 9/11/2017 | 9/11/2017 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/31/2017 | 8/31/2017 | 9/11/2017 | | PASS |
Josh Bogle
|
|
|
garage
|
Routing - MECHANICAL | 9/11/2017 | | 9/11/2017 | | FAIL |
Chad Schwendiman
|
|
|
Emailed correction to Air Comfort zone
|
Routing - PLAN CHECK | 9/11/2017 | | 9/11/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/11/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/11/2017 | | |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 9/11/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/11/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/31/2017 | 8/31/2017 | 8/31/2017 | A | FAIL |
Josh Bogle
|
|
|
took in as level 2 pending ACCA report submittal - jab
|
Routing Walk-In (Zoning) | 8/24/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
David Moser
|
|
|
Needs elevations
|
Routing Walk-In (BLD) | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | FAIL |
Brian McGowan
|
|
|
No wall bracing, dimensions on plan do not match site plan, middle portion oh upper floor is a two story and cannot be done with trusses alone.
|
Routing - PLAN CHECK | 8/24/2017 | | 8/24/2017 | | FAIL |
Brian McGowan
|
|
|
No wall bracing, dimensions on plan do not match site plan, middle portion oh upper floor is a two story and cannot be done with trusses alone.
|
1st review completed | | | 8/24/2017 | | FAIL |
Brian McGowan
|
|
|
No contact
|
Routing - PLAN CHECK | 8/24/2017 | | 8/24/2017 | | FAIL |
Brian McGowan
|
|
|
No contact
|
Application received | | 8/24/2017 | | | |
|
|
|
|