BLD-Final | 8/27/2019 | 8/29/2019 | 8/29/2019 | A | PASS |
Tell Riley
|
|
|
cay Phone #: ###-####//final inspection//finishing paint this week--1 wall left on exterior--per owner// not electrical was installed and garage is unfinished//advised electrical permit will be needed if electrical is installed at a later date//
|
DOC - Permit Finaled | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 | | PASS |
Tell Riley
|
|
|
Expires: 09/17/19
|
BLD-Aging Inspection | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Jim Sly
|
|
|
Cees Phone #: ###-#### Talked with Cees....Slow progress, but still working on project.....installing siding and doors at this point.
|
BLD-Final | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | NR |
Jim Sly
|
|
|
WIP
|
BLD-Aging Inspection | 1/4/2019 | 1/4/2019 | 1/10/2019 | | CANC |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 8/23/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Jim Sly
|
|
|
|
BLD-Final | 8/21/2018 | 8/22/2018 | 8/23/2018 | P | CANC |
Jim Sly
|
|
|
Cees Phone #: ###-####
|
BLD-Final | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | NR |
Jim Sly
|
|
|
Cees Phone #: ###-#### Need Mech Final.
|
BLD-Wall Bracing | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Jim Sly
|
|
|
call 15 mins ahead- Cees Phone #: ###-####
|
BLD - Request for Extension | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Jim Sly
|
|
|
Cees Phone #: ###-####
|
BLD-Foundation | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Jim Sly
|
|
|
30 min call ahead- Cees Phone #: ###-####
|
BLD-Footing | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | PASS |
Jim Sly
|
|
|
Please call ahead for access - Cees Phone #: ###-####
|
OVERRIDE | | | 9/29/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/29/2017 | 9/29/2017 | 9/29/2017 | A | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 9/29/2017 | 9/29/2017 | 9/29/2017 | A | PASS |
Colleen T Carroll
|
|
|
|
1st review completed | | | 9/29/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/29/2017 | | 9/29/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/29/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/29/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 9/29/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/29/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/22/2017 | 9/22/2017 | 9/22/2017 | A | FAIL |
Josh Bogle
|
|
|
needed lateral engineering for tall walls
|
1st review completed | | | 9/22/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/22/2017 | | 9/22/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 8/25/2017 | 8/25/2017 | 8/25/2017 | A | FAIL |
Brian McGowan
|
|
|
needed to bring in two sets of plans
|
1st review completed | | | 8/25/2017 | | FAIL |
Brian McGowan
|
|
|
Need two sets of plans
|
Routing - PLAN CHECK | 8/25/2017 | | 8/25/2017 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 8/25/2017 | | | |
|
|
|
|