Print Statement | | | 3/16/2018 | | DONE |
|
|
|
sent 1st late notice on 3-19-18
|
Print Statement | | | 12/13/2017 | | DONE |
|
|
|
|
Second Notice | | 11/24/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
First Notice | | 11/4/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
FIRE-Final Inspection | 10/25/2017 | 10/25/2017 | 10/25/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 10/25/2017 | 10/25/2017 | 10/25/2017 | A | PASS |
Bob Archibald
|
|
|
Inspection requested by legal tenant. Life safety provisions completed. Ok for occupancy.
|
Meeting | | | 10/25/2017 | | DONE |
|
|
|
as per Bob A-i removed the condition hold and scheduled inspections-if Victor Clark has questions please have him call Bob A
|
Print Occupancy Form | | | 10/25/2017 | | DONE |
Christina Prado
|
|
|
|
Permanent Occupancy | | | 10/25/2017 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 10/23/2017 | 10/25/2017 | 10/24/2017 | P | CANC |
Mike Jordan
|
|
|
Nikki Phone #: ###-####-cancelled-GC did not call in inspection-no one can do work but him (Victor Clark)
|
FIRE-Final Inspection | 10/23/2017 | 10/25/2017 | 10/24/2017 | A | CANC |
Troy Cobbley
|
|
|
Nikki Phone #: ###-####-GC did not call in inspection-no one can do work but him (Victor Clark)
|
BLD-Conference | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | DONE |
Mike Jordan
|
|
|
Noted that barber college was operating with no cert. of occupancy. Fire/life/safety inspection failed, per fire corrections additional horn strobes need to be added and a fire sprinkler head is over spaced. No temp. occupancy has been given by fire inspector. It appears that a fire alarm permit has been issued and treasure valley fire is doing the sprinkler work per the tenant. A correction notice was issued stating that no occupancy is allowed until all fire issues have been resolved and building final has been scheduled and inspected. Did note that the tenant did have a sign at main entry stating that the college was closed until this wednesday.
|
FIRE-Final Inspection | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide modifications to the fire alarm system to provide coverage to the common use areas and sprinkler system to provide coverage in the Ordinary Harard areas, need to test emergency lighting and exit signs and I need verification of the annual inspection for the fire sprinkler system
Victor Phone #: ###-####
|
BLD-Final | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew Clark. No framin nspections were done. Neds fire/life/safety final.
|
Print Occupancy Form | | | 9/21/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/21/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/11/2017 | 9/11/2017 | 9/15/2017 | | PASS |
Javier Guzman
|
|
|
9/15 L1 Boise Barber College ePlan
|
Routing - PLAN CHECK | 9/11/2017 | | 9/15/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/15/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/15/2017 | | DONE |
|
|
|
all have been MET-Need
GC Form-MET
Rev Cert of Val-don't need since they were the the applicant
|
Routing - PLUMBING | 9/11/2017 | | 9/13/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 9/11/2017 | | 9/12/2017 | | PASS |
Doug Chausow
|
|
|
Ste 100
|
Routing - PUBLIC WORKS | 9/11/2017 | | 9/12/2017 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING FIXTURES
|
Intake Approval | | | 9/11/2017 | | PASS |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 9/7/2017 | | DONE |
Julie Romig
|
|
|
Spoke with Andrew Clark regarding the plumbing plans and that they neeed to be stamped/signed by an engineer and specific to this project.
|
Intake Approval | | | 9/7/2017 | | FAIL |
Julie Romig
|
|
|
3. Plumbing plans for relocated hair sinks/floor drain with water and waste lines shown specific to this tenant improvement project. Plumbing plans are to be stamped/signed by Idaho engineer unless otherwise approved by Bill Vandegrift, (bvandegrift@cityofboise.org). If not providing engineered plans, include approval form Bill.
|
Intake Approval | | | 8/29/2017 | | FAIL |
Julie Romig
|
|
|
3. Plumbing plans for relocated hair sinks/floor drain with water and waste lines shown. Plumbing plans are to be stamped/signed by Idaho engineer unless otherwise approved by Bill Vandegrift, (bvandegrift@cityofboise.org). If not providing engineered plans, include approval form Bill.
|
Intake Approval | | | 8/29/2017 | | FAIL |
Julie Romig
|
|
|
To complete your application, provide the following:
1. Completed Form 304 Registred Design Professional.
2. Completed Form 518 Minor Tenant Improvement Submittal Checklist.
3. Plumbing plans for relocated hair sinks/floor drain with water and waste lines shown. Plumbing plans are to be stamped/signed by Idaho engineer unless otherwise approved by Bill Vandegrift, (bvandegrift@cityofboise.org). If not providing engineered plans, include approval form Bill.
4. Rotate all drawing sheets to horizontal.
|
Application received | | | 8/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 25 2017 12:23PM
|