CHANGE STATUS TO (ISS) | | | 7/10/2020 | | DONE |
|
|
|
Permit reactivated to allow electrical roughin and final. A final bld inspection will be required after electrical final .
|
BLD-Final | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Wall Bracing | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PART |
Jim Sly
|
|
|
Jen Phone #: ###-#### Exterior nailing only........OK. need retro fit hold downs installed.
|
BLD-Wall Bracing | 8/24/2018 | 8/27/2018 | 8/27/2018 | A | PART |
Jim Sly
|
|
|
matthew Phone #: ###-#### All OK .......except 2 front Wing Walls.
|
BLD-Foundation | 11/7/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Jim Sly
|
|
|
Rebar // Jesse Phone #: ###-#### Inspection of Epoxy Doweling per Engineering
|
BLD-Foundation | 11/7/2017 | 11/8/2017 | 11/8/2017 | A | CANC |
Jim Sly
|
|
|
Jesse Phone #: ###-#### Re-scheduled.
|
Issue PAID IN FULL permit | | | 9/26/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/21/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 8/28/2017 | 8/28/2017 | 9/21/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete. Shop was built without a permit. Foundation does not meet code. He needs to provide engineering showing how his 800+ square foot can meet frost depth requirements. His current footing is not even 8" below grade.
|
Telephone call | | | 9/21/2017 | | DONE |
|
|
|
Left a message for Matt informing him that his permit is ready the fee amount due for issuance
|
Routing - PLAN CHECK | 9/21/2017 | | 9/21/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/21/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/28/2017 | | 8/29/2017 | | FAIL |
Brian McGowan
|
|
|
Needs engineering showing the connection of existing to new foundation walls to 24" below grade.
|
Plan resubmittals received | | | 8/28/2017 | | DONE |
|
|
|
was a walk in but customer needed more info so left with permit-ready to have plans reviewed-Brian McGowan said to take in and put on his chair
|
Routing Walk-In (Zoning) | 8/25/2017 | 8/25/2017 | 8/25/2017 | P | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 8/25/2017 | 8/25/2017 | 8/25/2017 | P | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 8/25/2017 | | FAIL |
Brian McGowan
|
|
|
12" deep Foundation poured. Will need to provide engineering showing how the foundation meets shear and lateral, will carry the wall load and can meet frost depth requirements. He has engineering for lateral, the footing and tall wall engineering.
|
Routing - PLAN CHECK | 8/25/2017 | | 8/25/2017 | | FAIL |
Brian McGowan
|
|
|
12" deep Foundation poured. Will need to provide engineering showing how the foundation meets shear and lateral, will carry the wall load and can meet frost depth requirements. He has engineering for lateral, the footing and tall wall engineering.
|
Application received | | 8/25/2017 | | | |
|
|
|
|