Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD17-03048
StatusFinaled
Name ASBURY CONSTRUCTION LLC
Site Address 6728 W HAMMERMILL DR
Project Name18-2 MP #2
Customer Number 
ePlanReviewNo
Description
PLAN MODIFICATION - FOUNDATION FOR PERMIT 17-03049 WAS PUT ON THIS LOT- APPLICANT DESIRES TO SWITCH HOME FROM 17-03049 TO THIS PROPERTY. 11-7 ***BJM*** New scope of work - Permit for the construction of a new 2145 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 200 sq. ft. of covered patio/porch and a 650 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. - Old scope of work - Permit for the construction of a new 2239 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 282 sq. ft. of covered patio/porch and a 789 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (ISS)  7/10/2020  
Permit reactivated to allow electrical roughin and final. A final bld inspection will be required after electrical final .
CHANGE STATUS TO (FNL)  7/10/2020 DONE
Previous entry to change status mad in error
BLD-Final4/12/20184/13/20184/13/2018APASS
DetailsTony Young
Garage code is 1280 Phone #: ###-#### Inspection requested via web by Evan Waters
DOC - Permit Finaled4/13/20184/13/20184/13/2018PPASS
DetailsTony Young
BLD-Energy code compliance12/21/201712/22/201712/22/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Evan Waters
BLD-Framing/Rough-in12/20/201712/21/201712/21/2017APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Evan Waters
BLD-Framing/Rough-in12/19/201712/20/201712/20/2017PFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Evan Waters,, correction posted,, do not insulate
BLD-Wall Bracing12/5/201712/5/201712/5/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Evan Waters
CHANGE STATUS TO (ISS)  11/13/2017 DONE
(F) Reprint permit  11/13/2017 DONE
OVERRIDE  11/9/2017  
Plan assigned to (BJM)11/6/201711/6/201711/9/2017 DONE
DetailsBrian McGowan
Plan mods sent to Planning and Mechanical
Telephone call  11/9/2017 DONE
called to let know plan mod was ready and how much is owed-left message on Johns voice mail
Permit Ready to Issue  11/9/2017 DONE
plan mod-please do not re-issue-plans are in the new SFD drawers-Asbury Construction
Routing - PLAN CHECK11/6/2017 11/8/2017 PASS
DetailsBrian McGowan
The plans originally from BLD17-03049 are to be used for this Permit and lot. See new site Plan
Routing - MECHANICAL11/6/2017 11/8/2017 PASS
DetailsTroy James
Case Summary (BLD)  11/8/2017 DONE
DetailsBrian McGowan
Routing - PLANNING11/6/2017 11/7/2017 PASS
DetailsSusan Riggs
Plan Modification Accepted  11/6/2017 DONE
One copy of manual J, one copy of sheets PL1, S1, S2, S3, S4, S5, S6, A1, A2,A3, E1 and M1. Taken to Brian Mc
BLD-Foundation10/22/201710/23/201710/23/2017PPART
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
BLD-Foundation10/19/201710/20/201710/20/2017PCANC
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Inspection cancelled via mobile web on Friday, October 20, 2017.
BLD-Footing10/18/201710/19/201710/19/2017PPART
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
Issue PAID IN FULL permit  10/10/2017 DONE
(F) Reprint permit  10/10/2017 DONE
OVERRIDE  10/5/2017  
Inspection Record Card- Bld  10/5/2017 DONE
Telephone call  10/5/2017 DONE
Spoke with Evan informing him that his permit is ready and the fee amount due for issuance
Routing - PLAN CHECK9/12/2017 10/5/2017 PASS
DetailsBrian McGowan
Plan assigned to (M_H)10/3/2017 10/5/2017 DONE
DetailsMichael Hanson
9/21 sfd L1 paper - 1st review completed ready for plan check certified to review.
1st review completed  10/5/2017 DONE
DetailsMichael Hanson
Case Summary (BLD)  10/5/2017 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  10/5/2017 DONE
DetailsMichael Hanson
Permit Ready to Issue  10/5/2017 DONE
Need RP
Plan assigned to (BJM)9/8/20179/8/201710/3/2017 DEFR
DetailsBrian McGowan
9/21 sfd L1 paper
Plan Reviewer's activity  10/3/2017 DONE
DetailsMichael Hanson
Routing - MECHANICAL9/11/2017 9/12/2017 PASS
DetailsTroy James
Route to Impact Fee Review9/8/20179/11/20179/11/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING9/11/2017 9/11/2017 PASS
DetailsJeff Lowe
Routing - Addressing9/8/2017 9/11/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/8/2017 9/11/2017 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  9/8/2017 DONE
Recd Pcfee & Taken To Pln CK  9/8/2017 DONE
Intake Approval  9/8/2017 PASS
Intake Approval  8/28/2017 FAIL
Upload plans as individual sheets and name correctly, need CO alarms on plans
Application received  8/25/2017 DONE
Application submitted via PDS Online on Aug 25 2017 1:04PM