BLD-Final | 12/14/2018 | 12/14/2018 | 12/16/2018 | P | PASS |
Tony Young
|
|
|
Luff Phone #: ###-####
|
DOC - Permit Finaled | 12/16/2018 | 12/16/2018 | 12/16/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 12/13/2018 | 12/14/2018 | 12/16/2018 | A | PASS |
Tony Young
|
|
|
Luff Phone #: ###-####// 2.
|
BLD-Final | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Tony Young
|
|
|
Luff Phone #: ###-####
|
BLD-Blower Door Test Results | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | NR |
Tony Young
|
|
|
Luff Phone #: ###-####
|
BLD-Final | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | NR |
Tony Young
|
|
|
Luff Phone #: ###-####
|
BLD-Final | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | NR |
Tony Young
|
|
|
Luff Phone #: ###-####,, needs trades
|
BLD - Request for Extension | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Tony Young
|
|
|
Cameron Phone #: ###-####
|
Plan Modification Accepted | | | 8/7/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 8/7/2018 | | 8/7/2018 | | PASS |
Troy James
|
|
|
resubmitted manua j report
|
BLD-Energy code compliance | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Brandon Shaw
|
|
|
Call to meet // Cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT.
|
BLD-Framing/Rough-in | 4/16/2018 | 4/17/2018 | 4/17/2018 | A | FAIL |
Mike Jordan
|
|
|
Cameron-call 30 mins ahead Phone #: ###-####. Provide truss engineering. Nail off all hangars. Fireblock upstairs at tub at ceiling. Provide engineering for cut LVL on back porch. Ok to insulate. Correction notice issued.
|
BLD-Wall Bracing | 12/15/2017 | 12/15/2017 | 12/15/2017 | P | PART |
Jim Sly
|
|
|
shear // Cameron Phone #: ###-#### Exterior nailing and 4 STHD 14 hold downs at front of house......OK. did not verify other types of Hd s.......(if any) check at frame. OK to wrap.
|
BLD-Footing | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | PASS |
Brandon Shaw
|
|
|
Jared Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/17/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/16/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 8/25/2017 | 8/25/2017 | 10/16/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete-fail- 9/07 sfd L1 paper
|
Inspection Record Card- Bld | | | 10/16/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2017 | | DONE |
|
|
|
called Cameron and left voice mail permit is ready and fee due.
|
Routing - PLAN CHECK | 10/16/2017 | | 10/16/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/16/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/16/2017 | | DONE |
Christina Prado
|
|
|
All met, owner is RP
|
Plan resubmittals received | | | 10/10/2017 | | DONE |
|
|
|
Resubmittals recieved 2 sets of sheets A-1, A-2, A-3, A-4, A-5, A-6, A1-0.1, A-1.1, A-2.1, A-2.2, A-2.3, A-2.4, A-3.1, A-3.2, A-4.1, A-4.2, A-4.3,A-4.4, A-4.5, A-5.1,A-5.2, A-5.3, ,EP-1, MEP-2- 2 small site plans & a form #310-took to Brian McGowan
|
Routing - PLAN CHECK | 8/31/2017 | | 10/2/2017 | | FAIL |
Brian McGowan
|
|
|
Plans do not match from sheet to sheet, misc structure items.
|
1st review completed | | | 10/2/2017 | | FAIL |
Brian McGowan
|
|
|
Plans do not match from sheet to sheet, misc structure items.
|
Routing - MECHANICAL | 8/29/2017 | | 8/31/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/28/2017 | | 8/29/2017 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 8/25/2017 | | 8/28/2017 | | PASS |
Laura Hunter
|
|
|
Recieved new parcel information from Ada County due to ROS. Manually put in parcel information for this permit.
|
Routing - PUBLIC WORKS | 8/25/2017 | | 8/28/2017 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 8/25/2017 | 8/28/2017 | 8/27/2017 | | PASS |
Eric Bilimoria
|
|
|
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
|
Plans ACCEPTED BY PLAN TECH | | | 8/25/2017 | | DONE |
|
|
|
|
Intake Approval | | | 8/25/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/25/2017 | | DONE |
|
|
|
|
Application received | | 8/25/2017 | | | |
|
|
|
|