Permit Information
Permit NumberBLD17-03085
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 3460 E HEARTLEAF DR
Project Name 
Customer NumberBLD17-03111 VOIDED FOUNDATION
ePlanReviewNo
Description
""WUI ZONE A REQUIREMENTS"" Permit for the construction of a new 2657 sq. ft., two story (first story 2158 sq. ft., second story 499 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 492 sq. ft. of covered patio/porch and a 787 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. cdm
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  8/7/2018 DONE
BLD-Conference3/20/20183/20/20183/20/2018PPASS
DetailsJim Storey
Garage floor will be getting in Epoxy and I would like to get inspected prior to that so that we can get our final on Friday thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
DOC - Permit Finaled3/20/20183/20/20183/20/2018PPASS
DetailsJim Storey
BLD-Energy code compliance1/9/20181/10/20181/10/2018APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in1/9/20181/10/20181/10/2018APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in1/8/20181/8/20181/8/2018PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch c/n ok to insulate
BLD-Framing/Rough-in1/4/20181/4/20181/4/2018PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch soffit ele need rated boxes
BLD-Wall Bracing1/4/20181/4/20181/4/2018PFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch pf not nailled
BLD-Foundation9/29/201710/2/201710/2/2017ANR
DetailsJim Storey
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Footing9/28/20179/29/20179/29/2017PPASS
DetailsJim Storey
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch setbacks ok
PubWorks Subgrade Approval9/27/20179/27/20179/27/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  9/18/2017 DONE
DetailsChristina Prado
OVERRIDE  9/14/2017  
Routing - FIRE9/14/20179/14/20179/14/2017 PASS
DetailsScott Arellano
OK per Scott Arellano
Plan assigned to (CDM)8/29/20178/29/20179/14/2017 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK9/7/2017 9/14/2017 PASS
DetailsCarl D Madsen
1st review completed  9/14/2017 DONE
Case Summary (BLD)  9/14/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/14/2017 DONE
Permit Ready to Issue  9/14/2017 DONE
MET
Inspection Record Card- Bld  9/14/2017 DONE
Telephone call  9/14/2017 DONE
DetailsChristina Prado
Called Bryan to advise permit is ready for pick up and gave fees due
Routing - PUBLIC WORKS9/7/2017 9/14/2017 PASS
DetailsRachael Beierle
Routing PW Grading-Hillside8/30/2017 9/7/2017 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - MECHANICAL9/7/2017 9/7/2017 PASS
DetailsTroy James
Routing - PLANNING9/7/2017 9/7/2017 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS8/30/2017 9/7/2017 PASS
DetailsMorgan Webb
Route to Impact Fee Review8/30/20179/2/20178/31/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Sewer Rating8/30/2017 8/30/2017 PASS
DetailsMorgan Webb
Routing - Addressing8/30/2017 8/30/2017 PASS
DetailsDoug Chausow
Intake Approval  8/29/2017 PASS
Plans ACCEPTED BY PLAN TECH  8/29/2017 DONE
Recd Pcfee & Taken To Pln CK  8/29/2017 DONE
Application received 8/29/2017