Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD17-03087
StatusIssued
Name CASCADE ENTERPRISES INC
Site Address 11818 W JOPLIN RD
Project NameCity of Boise West WWTF
Customer Number 
ePlanReviewYes
Description
(CITY OF BOISE WASTE WATER TREATMENT FACILITY) **Permit for expansion of an existing biofilter odor treatment system consisting of new retaining walls, associated site work, and piping modifications to the thickened primary sludge pumping system. Electrical improvements to be made to the headworks building, communications building, struvite building, and thickened primary sludge pumping building. Special inspections required per attached Form 310. Because this is not a building structure, no occupancy, construction type, or building area has been assigned. Approval is contingent upon adhering to the approved plans on file and attached engineering. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing10/17/201710/18/201710/18/2017APART
DetailsJim Sly
footing/conference // call for directions // Joe Phone #: ###-####
OK pending MTI special inspection, tests and approvals Rick Cummings Public Works also overseeing progress.
(F) Reprint permit  10/2/2017 DONE
Issue & PRINT to be Invoiced  9/29/2017 DONE
OVERRIDE  9/28/2017  
Route to Impact Fee Review9/25/20179/28/20179/28/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Permit Ready to Issue  9/28/2017 DONE
Need:
GC form
Revised value
Plan assigned to (JAR)9/14/20179/14/20179/27/2017 DONE
DetailsJulie Romig
1st Rev Comp - L3 City of Boise Sewer Treatment
Routing - PLAN CHECK9/27/2017 9/27/2017 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  9/27/2017 DONE
1st review completed  9/25/2017 FAIL
DetailsJulie Romig
Need stamped drawings.
Routing - Erosion and Sediment9/22/2017 9/22/2017 PASS
DetailsAndy J. Long
ESC plan approved. Valid PD and RP desingated. ESC site preparation inspection is required prior to starting construction.
Routing - PLAN CHECK9/14/2017 9/22/2017 FAIL
DetailsJulie Romig
Need stamped drawings.
Routing - PLUMBING9/14/2017 9/18/2017 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - PLANNING Land Div9/14/2017 9/15/2017 PASS
DetailsTodd Tucker
Routing - Addressing9/14/2017 9/15/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/14/2017 9/15/2017 PASS
DetailsRachael Beierle
NO NEW PLUMBING.
Print Statement  9/15/2017 DONE
Routing - PLANNING9/14/2017 9/14/2017 PASS
DetailsNicolette Womack
Plan Reviewer's activity  9/14/2017 PASS
Plan intake review approved
Intake Approval  9/14/2017 PASS
Intake Approval  9/12/2017 FAIL
(9-12-17) Please refer to the circled items in the Plan Intake Checklist. Please resolve each item as directed.
Intake Approval  9/12/2017 FAIL
(9-12-17) Please refer to the circled items in the Plan Intake Checklist. Some were resolved some were not. Please resolve each item as directed.
Application received  8/29/2017 DONE
Application submitted via PDS Online on Aug 29 2017 10:26AM