BLD-Framing/Rough-in | 10/30/2017 | 10/30/2017 | 10/31/2017 | P | FAIL |
Dave Hannah
|
|
|
call when on way to meet // Rob Mairs Phone #: ###-####-new permit needs to be pulled-permit was already finaled
|
CHANGE STATUS TO (FNL) | | | 10/31/2017 | | DONE |
|
|
|
inspection was called in so it changed the status to ISS-Inspector told GC he needs a new permit since this one had been finaled already
|
CHANGE STATUS TO (ISS) | | | 10/30/2017 | | DONE |
|
|
|
project only partially done per phone call from GC
|
Case Summary (BLD) | | | 9/21/2017 | | DONE |
|
|
|
|
BLD-Final | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
Routing Walk-In (BLD) | 8/30/2017 | 8/30/2017 | 8/30/2017 | A | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 8/30/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/30/2017 | | 8/30/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/30/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - energy no
|
Permit Ready to Issue | | | 8/30/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/30/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | FAIL |
Brian McGowan
|
|
|
Need section showing hand framing of roof, floor plan showing beams/headers ect.
|
1st review completed | | | 8/29/2017 | | FAIL |
Brian McGowan
|
|
|
Need section showing hand framing of roof, floor plan showing beams/headers ect.
|
Routing - PLAN CHECK | 8/29/2017 | | 8/29/2017 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 8/29/2017 | | | |
|
|
|
|