BLD-Final | 8/6/2019 | 8/6/2019 | 8/7/2019 | P | PASS |
Tell Riley
|
|
|
Please call Jon at ###-#### to coordinate access to home. I am able to get to home within 15 minutes of call. Phone #: ###-#### Inspection requested via web by Jon Yorgason//all corrections made and final is complete//
|
DOC - Permit Finaled | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/25/2019 | 7/26/2019 | 7/26/2019 | P | NR |
Tell Riley
|
|
|
Please call Jon @ ###-#### to coordinate time to meet for access to the home. Phone #: ###-#### Inspection requested via web by Jon Yorgason//discussed onsite what is needed for final//
|
BLD-Energy code compliance | 1/21/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Jim Sly
|
|
|
Please call or text Jon to notify of estimated time you will be at job site. Phone #: ###-#### Inspection requested via web by Jon Yorgason
|
BLD-Framing/Rough-in | 1/16/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Jon Yorgason Minor corrections 2 point load transfers.
|
BLD-Framing/Rough-in | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | FAIL |
Brandon Shaw
|
|
|
No City approved plans on site... No Truss Engineering... Air/foam seal not complete... Stair treads are more than 3/8" ...
|
BLD-Wall Bracing | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jon Yorgason
|
Plan Modification Accepted | | | 11/16/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 11/16/2018 | | 11/16/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Jim Sly
|
|
|
Edgar Phone #: ###-####
|
BLD-Footing | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PART |
Jim Sly
|
|
|
Edgar Phone #: ###-#### Garage and Front Entry.....OK.
|
BLD-Foundation | 8/10/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Dave Hannah
|
|
|
Please call Jon @ 208 ###-#### to confirm inspection time. We have concrete pour set up for 10 AM if possible to get inspection before 10. Inspection requested via web by Jon Yorgason
|
BLD-Foundation | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | NR |
Jim Storey
|
|
|
Inspection requested via web by Jon Yorgason missing horr bar and window blockouts with bar.
|
BLD-Footing | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Jon Yorgason
|
BLD-Conference | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | DONE |
Jim Sly
|
|
|
Please call Joan at 2087244350 to confirm time to beat on site Inspection requested via web by Jon Yorgason
|
Inspection Record Card- Bld | | | 7/12/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/12/2018 | | DONE |
|
|
|
|
Meeting | | | 7/12/2018 | | DONE |
|
|
|
Letter from parcel owner stating they are changing GC and took payment for name transfer.
|
BLD-Conference | 3/8/2018 | 3/9/2018 | 3/9/2018 | A | DONE |
Jim Sly
|
|
|
David Phone #: ###-####
|
BLD-Foundation | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | PASS |
Jim Sly
|
|
|
Late morning please - Jason Phone #: ###-#### or David ###-#### OK pending STRATA special inspections, tests and approvals. 5,000 psi @ 28 days.
|
BLD-Footing | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | PART |
Jim Sly
|
|
|
Jason Phone #: ###-#### Basmnt. Footing only....OK.
|
BLD-Conference | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | DONE |
Jim Sly
|
|
|
David-please call 30 mintues prior to meet Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/13/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/10/2017 | | |
|
|
|
|
Telephone call | | | 10/10/2017 | | DONE |
Christina Prado
|
|
|
called David to advise permit is ready to issue and gave fees due
|
Plan assigned to (M_H) | 10/4/2017 | | 10/10/2017 | | DONE |
Michael Hanson
|
|
|
9/12 sfd L1 paper
|
1st review completed | | | 10/10/2017 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 10/10/2017 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2017 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/10/2017 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 9/6/2017 | | 10/10/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 10/4/2017 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLANNING | 8/31/2017 | | 9/7/2017 | | PASS |
Sue Cummings
|
|
|
Circular driveway in front setback. Talked to builder to give him options. He'll talk to the owner and call back. 8/31/17. Builder O.K. with redlines 9/7/27
|
Routing - MECHANICAL | 8/31/2017 | | 9/6/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 8/30/2017 | 9/2/2017 | 8/31/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/30/2017 | | 8/31/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 8/31/2017 | | PASS |
|
|
|
|
Plan assigned to (BJM) | | 8/30/2017 | 8/30/2017 | | DEFR |
Brian McGowan
|
|
|
9/12 sfd L1 paper
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/30/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/30/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 8/30/2017 | | | |
|
|
|
|