Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-03118
StatusFinaled
Name TIMBER AND LOVE INC
Site Address 1612 N 10TH ST
Project Nameremodel and addition
Customer Number 
ePlanReviewNo
Description
Permit for a remodel/addition to include: creating a bedroom & bath in the basement (watch head height), stairs relocated, main level some walls and openings change, 640 sq' upper level being added with two bedrooms & a bath, front porch being added. Garage may be repaired but not rebuilt on this permit. Permit DOES NOT INCLUDE DETAILS FOR REAR LANDINGS. All work per plans, notes, & local code. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/26/20186/28/20186/28/2018PPASS
DetailsTony Young
Clint Phone #: ###-####
DOC - Permit Finaled6/28/20186/28/20186/28/2018PPASS
DetailsTony Young
BLD-Final6/13/20186/14/20186/14/2018PPART
DetailsTony Young
Clint-please call prior to meet for access Phone #: ###-####,, need open risers less than 4",, window well egress,, 1.5" finger clear on handrail
Zoning Approval6/14/20186/14/20186/14/2018 DONE
DetailsTed Vanegas
Routing Walk-In (BLD)5/1/20185/1/20185/1/2018APASS
DetailsJosh Bogle
BLD-Final11/28/201711/28/201711/28/2017PNR
DetailsTony Young
Zack-please call 30 minute prior to meet Phone #: ###-####,, not ready,, need trades and zoning,, new steel beam ok,, per engineering
Plan Modification Accepted  10/24/2017 DONE
new manual j report
Routing - MECHANICAL10/24/2017 10/24/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Energy code compliance10/12/201710/13/201710/13/2017APASS
DetailsTony Young
Zack Phone #: ###-####
BLD-Framing/Rough-in10/12/201710/12/201710/12/2017PPART
DetailsTony Young
Zack Phone #: ###-####,, work in progress,, need to verify seal pack,, ok to insulate,, see other notes and trades notes
BLD-Framing/Rough-in10/11/201710/12/201710/12/2017APART
DetailsTony Young
Zack Phone #: ###-####,, ok to insulate,, needs engineer to look at floor joist cut in laundry
BLD-Energy code compliance10/11/201710/12/201710/12/2017ANR
DetailsTony Young
Zack Phone #: ###-####,, need trades 1st
BLD-Framing/Rough-in10/6/201710/11/201710/11/2017ANR
DetailsBrandon Shaw
Zack Phone #: ###-####
BLD-Energy code compliance10/6/201710/11/201710/11/2017ANR
DetailsBrandon Shaw
Zack Phone #: ###-####
BLD-Conference10/9/201710/10/201710/10/2017ACANC
DetailsMike Jordan
Zach Phone #: ###-####
BLD-Footing9/27/20179/28/20179/28/2017APASS
DetailsTony Young
Zack Phone #: ###-####,, front porch footing ok
Fees Due Hold9/27/2017 9/27/2017 DONE
DetailsChristina Prado
Telephone call  9/26/2017 DONE
called left message on phone that there is a fee due
OVERRIDE  9/22/2017  
Telephone call  9/22/2017 DONE
called Zach to let know permit is ready
Issue PAID IN FULL permit  9/22/2017 DONE
Permit Ready to Issue  9/22/2017 DONE
need RP-MET
Routing Walk-In (BLD)9/21/20179/21/20179/21/2017ADONE
DetailsJosh Bogle
Plan assigned to (JAB) Josh9/5/20179/5/20179/21/2017 PASS
DetailsJosh Bogle
Routing - PLAN CHECK9/21/2017 9/21/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  9/21/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  9/21/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/21/2017 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Routing Walk-In (BLD)9/20/20179/20/20179/20/2017AFAIL
DetailsJosh Bogle
just did walk in so it'd show on Josh's list
Routing - PLAN CHECK9/20/2017 9/20/2017 FAIL
DetailsJosh Bogle
plans look good, just missing app, man J, & other assorted misc. papers JAB
Plan assigned to (JAB) Josh9/5/20179/5/20179/19/2017 FAIL
DetailsJosh Bogle
needed more structural info
Routing - PLAN CHECK9/5/2017 9/19/2017 FAIL
DetailsJosh Bogle
1st review completed  9/19/2017 FAIL
DetailsJosh Bogle
Routing - MECHANICAL9/5/2017 9/7/2017 PASS
DetailsTroy James
Routing - Design Review9/5/2017 9/7/2017 PASS
DetailsTed Vanegas
Garage does not meet setbacks or backup space requirements. This approval does not include the reconstruction of the garage. Applicant has stated that they will not reconstruct the garage afterall and will only reside and reroof.
Intake Approval  9/5/2017 PASS
Application received  8/30/2017 DONE
Application submitted via PDS Online on Aug 30 2017 2:07PM