BLD-Final | 11/3/2017 | 11/9/2017 | 11/10/2017 | P | NR |
Jim Sly
|
|
|
Brandi ext 211 Phone #: ###-#### Need Electrical Final.
|
BLD-Framing/Rough-in | 11/3/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Jim Sly
|
|
|
Brandi ext 211 Phone #: ###-####
|
Routing - PLAN CHECK | 10/9/2017 | | 10/9/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 10/9/2017 | | DONE |
|
|
|
all met
|
Issue PAID IN FULL permit | | | 10/9/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2017 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 9/20/2017 | | 10/9/2017 | | DONE |
Michael Hanson
|
|
|
this is a re submittal solar panel - 1st review completed
|
Routing - PLAN CHECK | 9/20/2017 | | 9/25/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 9/20/2017 | | 9/21/2017 | | PASS |
Jeff Lowe
|
|
|
|
Plan assigned to (JAB) Josh | 8/30/2017 | 8/30/2017 | 9/20/2017 | | DEFR |
Josh Bogle
|
|
|
soalr panels
|
Plan Reviewer's activity | | | 9/20/2017 | | FAIL |
Michael Hanson
|
|
|
Provide footing plan with size and depth denoted
Provide engineering document that specifies that uplift has been accounted for in footing and connections of ground mounted array.
|
Routing - PLAN CHECK | 8/30/2017 | | 9/7/2017 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 9/7/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | | 8/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 30 2017 4:05PM
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2017 | | DONE |
|
|
|
|
Intake Approval | | | 8/30/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/30/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 8/30/2017 | | 8/30/2017 | | FAIL |
Jeff Lowe
|
|
|
the ground mounted solar array does not appear to meet the rear yard setback. I estimate the array structure to be approximately 360 square feet (please verify) and thus it needs to be a minimum of 9-feet from the rear setback, as long as the structure is 6-feet from any other structure. Please submit a site plan with dimensions of the array and the measurements from the property lines.
|