BLD-Final | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Mike Jordan
|
|
|
Vince Phone #: ###-####
|
DOC - Permit Finaled | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 8/2/2018 | 8/2/2018 | 8/2/2018 | A | DONE |
Mike Jordan
|
|
|
3.9ACH @50pa
|
BLD-Final | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | NR |
Mike Jordan
|
|
|
Vince Phone #: ###-#### want siding and foundation doubled check; cracking. Per Kristian Myer. Mech final has failed.
|
BLD-Energy code compliance | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Mike Jordan
|
|
|
Vince Phone #: ###-####
|
BLD-Wall Bracing | 4/13/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Mike Jordan
|
|
|
Vince Phone #: ###-####
|
BLD-Conference | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | PASS |
Mike Jordan
|
|
|
Vince Phone #: ###-####
|
BLD-Framing/Rough-in | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | FAIL |
Mike Jordan
|
|
|
Vince Phone #: ###-####. Comlplete lateral bracing on B04, C01, C02 and C03 trusses. Ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PART |
Brandon Shaw
|
|
|
See correction notice
|
BLD-Footing | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | CANC |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Mike Jordan
|
|
|
Chris Phone #: ###-####
|
BLD-Footing | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | CANC |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/8/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/18/2017 | | |
|
|
|
|
Plan assigned to (RDP) | 10/9/2017 | 10/9/2017 | 10/18/2017 | | DONE |
Rob Patrick
|
|
|
Moved to Brian for checking
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2017 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 10/18/2017 | | DONE |
|
|
|
All Met
|
Routing - PLAN CHECK | 9/20/2017 | | 10/18/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 10/18/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Erosion and Sediment | 9/20/2017 | | 9/22/2017 | | PASS |
Andy J. Long
|
|
|
General ESC permit issued. No ESC plan or plan waiver required. No stormwater runoff to site shall be allowed to flow to canal, which is protected by fencing, embankment, and bankside vegetation. Please see ESC permit conditions.
|
Route to Impact Fee Review | 9/20/2017 | 9/23/2017 | 9/21/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (BJM) | 9/20/2017 | 9/20/2017 | 9/20/2017 | | DEFR |
Brian McGowan
|
|
|
10/03 sfd L1 ePlan
|
Routing - MECHANICAL | 9/20/2017 | | 9/20/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/20/2017 | | 9/20/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 9/20/2017 | | 9/20/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/20/2017 | | 9/20/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 9/20/2017 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/20/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/20/2017 | | DONE |
|
|
|
|
Intake Approval | | | 8/31/2017 | | FAIL |
|
|
|
No floor plan uploaded and need ESC plans/narrative or waiver request letter since within 100 feet of waterway.
|
Application received | | | 8/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 30 2017 6:35PM
|