BLD-Final | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | PASS |
Brandon Shaw
|
|
|
Aaron Phone #: ###-####
|
DOC - Permit Finaled | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | PASS |
Brandon Shaw
|
|
|
Footing inspection can be done later in the AM. Aaron will be doing the installation and his cell ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Permit Ready to Issue | | | 9/27/2017 | | DONE |
|
|
|
all met
|
Issue PAID IN FULL permit | | | 9/27/2017 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 9/22/2017 | 9/22/2017 | 9/26/2017 | | PASS |
Josh Bogle
|
|
|
1st - done my M_H - watching for flood plain & HRRB approval
|
Routing - PLANNING | 9/26/2017 | | 9/26/2017 | | PASS |
Sue Cummings
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing - PLAN CHECK | 9/18/2017 | | 9/26/2017 | | PASS |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 9/18/2017 | 9/18/2017 | 9/21/2017 | | DEFR |
Josh Bogle
|
|
|
patio cover
|
Plan assigned to (M_H) | 9/21/2017 | | 9/21/2017 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/21/2017 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 9/21/2017 | | DONE |
Michael Hanson
|
|
|
|
Intake Approval | | | 9/18/2017 | | FAIL |
|
|
|
Plans must be uploaded as individual sheets. Drawing file names must include the information on sheets.
|
Plans ACCEPTED BY PLAN TECH | | | 9/18/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/18/2017 | | DONE |
|
|
|
no fee taken at this time, 406
|
Intake Approval | | | 9/18/2017 | | PASS |
|
|
|
|
Application received | | | 8/31/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 31 2017 10:56AM
|
Routing - PLANNING | 9/18/2017 | | | | FAIL |
|
|
|
Needs arroval from the HRRB
|