BLD-Final | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | PASS |
Jim Storey
|
|
|
before 11am please // Tamara Phone #: ###-####
|
DOC - Permit Finaled | 11/28/2017 | 11/28/2017 | 11/28/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 11/16/2017 | 11/16/2017 | 11/17/2017 | P | FAIL |
Jim Storey
|
|
|
Please call for access, homeowner in and out - Tamara Phone #: ###-#### need handrail
|
BLD-Energy code compliance | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PASS |
Jim Sly
|
|
|
Insulation // Tamara Phone #: ###-####
|
BLD-Wall cover | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | PART |
Brandon Shaw
|
|
|
Dampproofing exterior basement walls, OK to insulate
|
BLD-Wall cover | 9/5/2017 | 9/6/2017 | 9/6/2017 | P | PART |
Brandon Shaw
|
|
|
Foam seal exterior vertical and horizontal penetrations. Water/dampproof exterior basement walls.
|
Routing Walk-In (BLD) | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 8/31/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/31/2017 | | 8/31/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/31/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/31/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/31/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/31/2017 | | DONE |
|
|
|
|
Application received | | 8/31/2017 | | | |
|
|
|
|