BLD-Final | 4/23/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Brandon Shaw
|
|
|
House will be open. Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Energy code compliance | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch mech failled pending aproval
|
BLD-Framing/Rough-in | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
|
BLD-Framing/Rough-in | 1/30/2018 | 1/31/2018 | 1/31/2018 | P | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch c/n
|
BLD-Wall Bracing | 1/24/2018 | 1/24/2018 | 1/24/2018 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch back d brace pannel missing 2 in oc #8 and hold down
|
BLD-Foundation | 10/7/2017 | 10/9/2017 | 10/9/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | NR |
Jim Storey
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo need to redig
|
PubWorks Subgrade Approval | 9/27/2017 | 9/27/2017 | 9/27/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 9/18/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/15/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 9/11/2017 | 9/11/2017 | 9/15/2017 | | DONE |
Carl D Madsen
|
|
|
|
Routing - FIRE | 9/12/2017 | 9/1/2017 | 9/15/2017 | | PASS |
Scott Arellano
|
|
|
No Sprinklers required per Scott Arellano
|
1st review completed | | | 9/15/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/15/2017 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | | | 9/15/2017 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/15/2017 | | DONE |
|
|
|
|
Telephone call | | | 9/15/2017 | | DONE |
|
|
|
Left a message for Doug informing him that this permit is ready and the fee amount due for issunace.
|
Case Summary (BLD) | | | 9/15/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/15/2017 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/11/2017 | | 9/12/2017 | | PASS |
Andy J. Long
|
|
|
Approved for demolition, valid RP designated with site plan submitted.
|
Plan assigned to (BJM) | | 9/1/2017 | 9/11/2017 | | DEFR |
Carl D Madsen
|
|
|
9/20 sfd L2 paper
|
Routing - MECHANICAL | 9/7/2017 | | 9/11/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/7/2017 | | 9/7/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | | | 9/7/2017 | | PASS |
|
|
|
|
Routing PW Grading-Hillside | 9/1/2017 | | 9/7/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Route to Impact Fee Review | 9/1/2017 | 9/4/2017 | 9/6/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Sewer Rating | 9/1/2017 | | 9/1/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 9/1/2017 | | 9/1/2017 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/1/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/1/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/1/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 9/1/2017 | | | |
|
|
|
|