Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD17-03161
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2367 S TRAPPER PL
Project Name13-1 Summit
Customer Number 
ePlanReviewYes
Description
***HILLSIDE = IN***WUI - ZONE A***Permit for the construction of a new 2765 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 376 sq. ft. of covered patio/porch and a 768 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.


Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/14/20186/14/20186/14/2018PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
DOC - Permit Finaled6/14/20186/14/20186/14/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results6/14/20186/14/20186/14/2018PDONE
DetailsBrandon Shaw
ACH50- 3.89
PubWorks Occupancy Approval6/14/20186/14/20186/14/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance3/26/20183/26/20183/26/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Austin Wagner
BLD-Energy code compliance3/23/20183/26/20183/26/2018APASS
DetailsBrandon Shaw
Austin Phone #: ###-####
BLD-Framing/Rough-in3/22/20183/22/20183/22/2018PPASS
DetailsBrandon Shaw
Austin Phone #: ###-####
BLD-Framing/Rough-in3/21/20183/21/20183/21/2018PDONE
DetailsBrandon Shaw
Austin Phone #: ###-####
BLD-Wall Bracing3/5/20183/5/20183/5/2018PPASS
DetailsBrandon Shaw
Shear // Rolo Phone #: ###-####
BLD-Foundation11/13/201711/13/201711/13/2017APASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
PubWorks Subgrade Approval11/13/201711/13/201711/13/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing11/9/201711/9/201711/9/2017PPASS
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing10/23/201710/24/201710/24/2017PCANC
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Tuesday, October 24, 2017.
Plan assigned to (M_H)9/18/2017 10/16/2017 DONE
DetailsMichael Hanson
1st review completed awaiting response for PW 9/26 MDH
Issue PAID IN FULL permit  10/10/2017 DONE
Inspection Record Card- Bld  10/10/2017 DONE
Routing - PUBLIC WORKS10/9/2017 10/9/2017 PASS
DetailsRachael Beierle
OVERRIDE  10/6/2017  
PLANS/APPL TAKEN TO FRONT DESK  10/6/2017 DONE
Permit Ready to Issue  10/6/2017 DONE
all met
Routing - PLAN CHECK9/18/2017 10/6/2017 PASS
DetailsBrian McGowan
Routing PW Grading-Hillside10/4/2017 10/4/2017 PASS
DetailsMelissa Jannusch


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
1st review completed  9/26/2017 DONE
DetailsMichael Hanson
Routing - FIRE9/5/20179/5/20179/19/2017 PASS
DetailsScott Arellano
No comments attached
Plan assigned to (JAB) Josh9/5/20179/5/20179/18/2017 DEFR
DetailsJosh Bogle
Deferreed to Michael
Routing - Erosion and Sediment9/5/2017 9/8/2017 PASS
DetailsAndy J. Long
ESC site map and narrative approved. Valid RP and PD. Site preparation inspection is required.
Routing PW Grading-Hillside9/5/2017 9/8/2017 FAIL
DetailsMelissa Jannusch
See changemarks in ePlan
Routing - MECHANICAL9/5/2017 9/7/2017 PASS
DetailsTroy James
Route to Impact Fee Review9/5/20179/8/20179/6/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING9/5/2017 9/6/2017 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS9/5/2017 9/5/2017 PASS
DetailsMorgan Webb
Routing - Addressing9/5/2017 9/5/2017 PASS
DetailsDoug Chausow
Intake Approval  9/5/2017 PASS
Plans ACCEPTED BY PLAN TECH  9/5/2017 DONE
Recd Pcfee & Taken To Pln CK  9/5/2017 DONE
Routing PW Sewer Rating9/5/2017 9/5/2017 PASS
DetailsMorgan Webb
Application received  9/1/2017 DONE
Application submitted via PDS Online on Sep 1 2017 2:02PM