Print Statement | | | 7/22/2020 | | DONE |
|
|
|
1ST MAILED STATEMENT
|
Third Notice | | 5/12/2020 | 5/12/2020 | | DONE |
|
|
|
This permit finaled on the web by Robert Hunter
|
Third Notice | | 4/8/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Second Notice | | 2/17/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
First Notice | | 1/16/2020 | 2/7/2020 | | DONE |
|
|
|
mailed 2-10-20
|
Print Occupancy Form | | | 1/6/2020 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/6/2020 | | DONE |
|
|
|
|
BLD-Final | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Tell Riley
|
|
|
Bob Phone #: ###-####//undersink padding added//final complete//no signature card//
|
BLD-Final | 12/2/2019 | 12/4/2019 | 12/4/2019 | P | NR |
Tell Riley
|
|
|
Chit Phone #: ###-####//need to add sink drain cover per description on two bathrooms//
|
FIRE-Final Inspection | 10/22/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection is complete, signature card not provided at time of inspection.
jEREMY Phone #: ###-####
|
BLD-Final | 7/31/2019 | 8/1/2019 | 7/31/2019 | A | CANC |
Tell Riley
|
|
|
Chip Moved From Weds--###-####//fist thing if possible//cancel per Chip//
|
FIRE-Final Inspection | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | FAIL |
Troy Cobbley
|
|
|
Still need some of the exit signs and emergency lights repaired. Also need a FIR permit for the duct detector and mag lock interface.
CHIP Phone #: ###-####
|
BLD-Final | 7/31/2019 | 7/31/2019 | 7/31/2019 | A | CANC |
Tell Riley
|
|
|
Chip Moved From Weds--###-####//fist thing if possible//
|
BLD-Final | 7/26/2019 | 7/31/2019 | 7/31/2019 | A | CANC |
Tell Riley
|
|
|
Please call Chip when on your way to inspection. Phone #: ###-#### Inspection requested via web by Robert Hunter
|
FIRE-Final Inspection | 12/6/2018 | 12/10/2018 | 12/10/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide testing of all exit signs and emergency lights, provide interconnection of the door mag and the fire alarm system as discussed and as IFC chapter 10, Provide verification/testing of the duct smoke detector and the new 6 ton hvac unit
Call ahead to meet // Chip Phone #: ###-####
|
Place hold on job | 5/16/2018 | | 5/21/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
Waiting for signed building pemit.
|
Issue PAID IN FULL permit | | | 5/14/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/14/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/5/2017 | 10/5/2017 | 4/5/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 10/18 L2 Faith Community Bible Church ePlan ***Route to Fire***
|
Routing - PLAN CHECK | 3/26/2018 | | 4/5/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/5/2018 | | DONE |
Christina Prado
|
|
|
NEED
GC FORM - met
REVISED VALUE - met
AR submitted forms - Jeremy Putman
|
Routing - FIRE | 3/26/2018 | 3/26/2018 | 4/2/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case.
|
Extend Review Timeline | | | 3/7/2018 | | DONE |
|
|
|
1st approved 180 day extension per adele. see documents
|
Telephone call | | | 12/15/2017 | | DONE |
|
|
|
Fire department contacted PDS_fire supervisor inquiring if fire alarm and fire sprinkler permits are in the process of being pulled for this project.
|
Route to Impact Fee Review | 10/17/2017 | 10/20/2017 | 10/18/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/17/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 10/5/2017 | | 10/17/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 10/5/2017 | | 10/5/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 10/5/2017 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/5/2017 | | FAIL |
Michael Hanson
|
|
|
Provide the following: 1. Signed 304 form 2. Egress door hardware components 3. Portable fire extinguisher locations 4. Roof plan showing RTU locations, existing RTU information, new RTU information 4. Mechanical compliance COMcheck 5. Heating and cooling load calculation 7. Mechanical plans stamped and signed by Idaho licensed engineer if the new RTU heating and cooling loads are different than existing 6. Structural plans if new RTU weight is greater than existing
|
Application received | | | 9/4/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 4 2017 5:11PM
|