BLD-Final | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Jim Sly
|
|
|
Frank Phone #: ###-####
|
DOC - Permit Finaled | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PASS |
Jim Sly
|
|
|
Call half hour before to meet // Frank Phone #: ###-####
|
BLD-Framing/Rough-in | 12/22/2017 | 12/22/2017 | 12/22/2017 | P | PASS |
Jim Sly
|
|
|
Frank Phone #: ###-####
|
BLD-Wall Bracing | 12/1/2017 | 12/1/2017 | 12/3/2017 | P | PASS |
Jim Sly
|
|
|
Shear / Frank Phone #: ###-####
|
BLD-Foundation | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Jim Sly
|
|
|
Steam wall/rebar-JR Phone #: ###-#### Verified full length rebar in footing for ground.
|
BLD-Footing | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Jim Sly
|
|
|
Frank Phone #: ###-####
|
PubWorks Subgrade Approval | 10/31/2017 | 10/31/2017 | 10/31/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 10/16/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/12/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/12/2017 | 10/12/2017 | 10/12/2017 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 10/10/2017 | 10/10/2017 | 10/12/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/10/2017 | | 10/12/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/12/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 10/12/2017 | | DONE |
|
|
|
MET
Need
RP
|
Routing Walk-In (BLD) | 10/10/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Josh Bogle
|
|
|
took in as level 2 (hillside) JAB
|
Routing PW Grading-Hillside | 10/10/2017 | | 10/10/2017 | | PASS |
Melissa Jannusch
|
|
|
Subgrade only and geotechnical report only.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
All runoff must be retained within the boundaries of the lot, directed toward the street drainage system if one exists.
|
Routing - Erosion and Sediment | 10/10/2017 | | 10/10/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. RP currently expired, okay for homeowner RP or interim RP.
|
Routing Walk-In (Zoning) | 9/5/2017 | 9/5/2017 | 9/5/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/5/2017 | 9/5/2017 | 9/5/2017 | A | FAIL |
Josh Bogle
|
|
|
needed more complete info - gave applicant submittal checklist
|
1st review completed | | | 9/5/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/5/2017 | | 9/5/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 9/5/2017 | | | |
|
|
|
|