Third Notice | | 4/15/2018 | 5/11/2018 | | DONE |
|
|
|
mailed 5-14
|
Third Notice | | 3/19/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
Second Notice | | 2/22/2018 | 3/14/2018 | | DONE |
|
|
|
Mailed 3-15-18
|
First Notice | | 2/2/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
Print Occupancy Form | | | 1/23/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/23/2018 | | DONE |
|
|
|
|
Zoning Approval | 1/19/2018 | 1/19/2018 | 1/19/2018 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 1/17/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Dave Hannah
|
|
|
Please contact Clint prior to going out. Phone #: ###-####
|
FIRE-Final Inspection | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Jim Page
|
|
|
Previously noted items have been completed, no fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
|
FIRE-Final Inspection | 1/11/2018 | 1/12/2018 | 1/12/2018 | P | FAIL |
Troy Cobbley
|
|
|
I left two messages on the contacts voice mail and also went to the project site. I was unable to test the exit discharge lights and I also noted that a building address was missing.
Clint Phone #: ###-####
|
BLD-Final | 12/1/2017 | 12/5/2017 | 12/5/2017 | P | CANC |
Dave Hannah
|
|
|
Clint Phone #: ###-####
|
BLD-Foundation | 12/1/2017 | 12/4/2017 | 12/4/2017 | P | DONE |
Dave Hannah
|
|
|
Please call ahead for access, requesting after 3 - Clint Phone #: ###-####
|
FIRE-Final Inspection | 12/1/2017 | 12/4/2017 | 12/4/2017 | P | FAIL |
Jim Page
|
|
|
THumbturn deadbolt on southeast door needs to be changed to a double-keyed deadbolt. Fire extinguishers need to be inspected by a licensed contractor and tagged accordingly. Provide emergency lighting for the exit discharge as stated in note number 7 of the building permit fire code review.
|
Issue PAID IN FULL permit | | | 10/31/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/31/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/29/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 9/7/2017 | 9/7/2017 | 9/29/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Building Review completed
|
Routing - PLAN CHECK | 9/29/2017 | | 9/29/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/29/2017 | | DONE |
|
|
|
NEED:
GC
rev cert of val
RP
|
Routing - Erosion and Sediment | 9/25/2017 | | 9/27/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Need RP at time of permit issuance.
|
Route to Impact Fee Review | 9/20/2017 | 9/23/2017 | 9/22/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - Erosion and Sediment | 9/20/2017 | | 9/22/2017 | | FAIL |
Andy J. Long
|
|
|
Project includes exterior work for parking area and will also have staging and waste management areas exposed during construction. Please submit ESC plan or ESC plan waiver request.
|
1st review completed | | | 9/20/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 9/20/2017 | | 9/20/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 9/20/2017 | | 9/20/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 9/7/2017 | 9/7/2017 | 9/19/2017 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - Design Review | 9/7/2017 | | 9/18/2017 | | FAIL |
Andrea Tuning
|
|
|
All parking areas, drive aisles and loading areas shall provide a 5-foot side and rear setbacks.
All parking, drive aisles and loading areas shall be paved.
Relocate the trash enclosure to be outside of the 10-foot front setback. The enclsoure shall also be screened from public view through the use of sight obscuring fencing or landscaping.
|
Routing - PLAN CHECK | 9/7/2017 | | 9/12/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Addressing | 9/7/2017 | | 9/8/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/7/2017 | | 9/8/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 9/7/2017 | | 9/8/2017 | | FAIL |
Andy J. Long
|
|
|
Project includes exterior work for parking area and will also have staging and waste management areas exposed during construction. Please submit ESC plan or ESC plan waiver request.
|
Intake Approval | | | 9/7/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 9/5/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 5 2017 1:01PM
|