BLD-Final | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Energy code compliance | 12/14/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 12/11/2017 | 12/11/2017 | 12/11/2017 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Wall Bracing | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Wall Bracing | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PART |
Mike Jordan
|
|
|
Dave Phone #: ###-####. 1st story portion on south side only so that siding could be placed for relocation of gas meter.
|
BLD-Framing/Rough-in | 10/25/2017 | 10/26/2017 | 10/26/2017 | P | PART |
Mike Jordan
|
|
|
floor framing // Dave Phone #: ###-####
|
BLD-Foundation | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | NR |
Mike Jordan
|
|
|
Rebar // David Phone #: ###-####
|
BLD-Footing | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | DONE |
Mike Jordan
|
|
|
David Phone #: ###-####
|
BLD-Footing | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Footing | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | FAIL |
Mike Jordan
|
|
|
David Phone #: ###-####. Required 10ft. side setback from property line. Only has 7ft. at south east end. Contractor notified.
|
OVERRIDE | | | 9/12/2017 | | |
|
|
|
|
OVERRIDE | | | 9/12/2017 | | |
|
|
|
|
OVERRIDE | | | 9/12/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/12/2017 | 9/12/2017 | 9/12/2017 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/12/2017 | | 9/12/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/12/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 9/12/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/12/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | FAIL |
Brian McGowan
|
|
|
Structural details lacking
|
1st review completed | | | 9/5/2017 | | FAIL |
Brian McGowan
|
|
|
Structural details lacking
|
Routing - PLAN CHECK | 9/5/2017 | | 9/5/2017 | | FAIL |
Brian McGowan
|
|
|
Structural details lacking
|
Application received | | 9/5/2017 | | | |
|
|
|
|