PubWorks Occupancy Approval | 1/22/2019 | 1/22/2019 | 1/22/2019 | | DONE |
Melissa Jannusch
|
|
|
Bond recieved for grading and drainge work and engineers approval letter.
|
BLD-Foundation | 12/28/2017 | 12/28/2017 | 12/29/2017 | P | PASS |
Tony Young
|
|
|
Steve-rebar Phone #: ###-####
|
BLD-Footing | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PEND |
Jim Sly
|
|
|
Steve Phone #: ###-#### No approved plan on site. Wants to pour lowest section.....( circle 1 on plan) approx 6 foot x 18 foot section approx 3 foot deep. Recommended that Architect or Engineer make a site visit and approve. The rebar in this section appears to match the "un-approved" plan. Pour at own risk.
|
BLD-Foundation | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####,, wall for pool supplies
|
BLD-Footing | 10/23/2017 | 10/24/2017 | 10/24/2017 | P | PART |
Tony Young
|
|
|
Greg- early pm if possible-please call when on the Phone #: ###-####
|
PubWorks Subgrade Approval | 10/24/2017 | 10/24/2017 | 10/24/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 10/20/2017 | 10/23/2017 | 10/23/2017 | P | PEND |
Tony Young
|
|
|
Greg- early pm if possible-please call when on the Phone #: ###-####,, needs soils report 1st
|
BLD-Footing | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | PEND |
Tony Young
|
|
|
Greg-late AM if possible-please call when on the Phone #: ###-####,, needs soils report 1st
|
Routing Walk-In (Zoning) | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | DONE |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 9/5/2017 | | 9/5/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
1st review completed | | | 9/5/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/5/2017 | | 9/5/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/5/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 9/5/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/5/2017 | | DONE |
|
|
|
|
Application received | | 9/5/2017 | | | |
|
|
|
|