Third Notice | | 7/15/2019 | 8/13/2019 | | DONE |
|
|
|
mailed 8-13 with second follow up
|
Second Follow up | | | 8/13/2019 | | DONE |
|
|
|
|
Third Notice | | 6/12/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11 with first follow up
|
First Follow up | | | 7/10/2019 | | DONE |
|
|
|
|
Third Notice | | 5/11/2019 | 6/7/2019 | | DONE |
|
|
|
mailed 6-10
|
Second Notice | | 4/18/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
First Notice | | 3/21/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
Permanent Occupancy | | | 3/11/2019 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/28/2019 | 2/28/2019 | 3/6/2019 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
FIRE-Final Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Pete Phone #: ###-####
|
BLD-Aging Inspection | 12/20/2018 | 12/20/2018 | 12/26/2018 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 11/26/2018 | 2/24/2019 | 11/26/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 90 day extension on temp c of o from 11-25-18
|
Telephone call | | | 11/26/2018 | | DONE |
|
|
|
emailed Tyler that the temp C of O was expired
|
BLD-Wall Bracing | 10/11/2018 | 10/11/2018 | 10/11/2018 | A | CANC |
Dave Hannah
|
|
|
Mike-exterior strap & shear Phone #: ###-####
|
Temporary Occupancy | 10/5/2018 | 1/3/2019 | 10/5/2018 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais ok to extend temp c of o thru Nov 25th
|
Telephone call | | | 10/5/2018 | | |
|
|
|
called Tyler to let know temp c of o is about to expire-left message on his phone
|
BLD-Aging Inspection | 7/25/2018 | 7/25/2018 | 7/30/2018 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 6/27/2018 | 9/25/2018 | 6/27/2018 | | DONE |
Candy A. Nichols
|
|
|
building final was done on 5/29/18-was ok'd for temp c of o
|
BLD-Final | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### ok for tco
|
FIRE-Final Inspection | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection complete for TCO in requested area of this permit, fire extinguisher is in place with a current inspection tag, fire alarm and fire sprinkler work to be completed with core and shell remodel, commercial cooking hood operational inspection complete, hood fire alarm interface to completed with core and shell fire alarm inspection. Per conversation with Romeo TCO is authorized for 90 days.
|
FIRE-Final Inspection | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | FAIL |
Jim Page
|
|
|
Commercial cooking hood fire suppression system did not pass inspection, FIR permit for hood suppression system needs to be finaled before life fire safety inspection can be completed.
Cody Phone #: ###-####
|
BLD-Final | 5/23/2018 | 5/25/2018 | 5/24/2018 | A | CANC |
Dave Hannah
|
|
|
Cody Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Dave Hannah
|
|
|
Cody Phone #: ###-####
|
BLD-Conference | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
FIRE-Conference | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
|
FIRE-Final Inspection | 4/12/2018 | 4/12/2018 | 4/12/2018 | A | CANC |
Jim Page
|
|
|
|
FIRE-Final Inspection | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | CANC |
Jim Page
|
|
|
Request was for a conference, not a final inspection, this request is cancelled.
|
BLD-Framing/Rough-in | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Conference | 1/26/2018 | 1/29/2018 | 1/29/2018 | A | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
Telephone call | | | 1/24/2018 | | DONE |
|
|
|
emailed Tyler that if he doesn't email the signed permit back to me today before noon, he will need to reply to myself and Christina so one of us can attach to Tidemark and sign off in the e plan system when we get it so they can print the approved plans
|
Issue PAID IN FULL permit | | | 1/23/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/23/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/23/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 9/22/2017 | 9/22/2017 | 11/2/2017 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - L3 Neckar Coffee Shop
|
Routing - PLUMBING | 10/30/2017 | | 11/2/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/2/2017 | | DONE |
|
|
|
NEED
GC-met
Rev cert of val-met
|
Routing - MECHANICAL | 10/30/2017 | | 10/30/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 10/30/2017 | | 10/30/2017 | | PASS |
Julie Romig
|
|
|
|
Route to Impact Fee Review | 10/13/2017 | 10/16/2017 | 10/13/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/13/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 9/22/2017 | | 10/13/2017 | | FAIL |
Julie Romig
|
|
|
Corrections required - see ePlanReview
|
Routing - FIRE | 9/22/2017 | 9/22/2017 | 9/28/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing PW Solid Waste | 9/25/2017 | | 9/27/2017 | | PASS |
Evan Carpenter
|
|
|
Approved for alley service.
|
Routing PW Environmental | 9/25/2017 | | 9/25/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Sewer Rating | 9/25/2017 | | 9/25/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - PUBLIC WORKS | 9/22/2017 | | 9/25/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 9/22/2017 | | 9/25/2017 | | FAIL |
Troy James
|
|
|
Left message to mechanical engineer to call me
|
Routing - PLUMBING | 9/22/2017 | | 9/25/2017 | | FAIL |
Bill VanDegrift
|
|
|
1) provide Suez Water required R.P. upstream of both F-1 and F-2
2) provide indirect waste for the 3 compartment sink. ISPC 801.2.3
|
Routing - PLANNING | 9/22/2017 | | 9/22/2017 | | PASS |
Cody Riddle
|
|
|
|
Routing - Addressing | 9/22/2017 | | 9/22/2017 | | PASS |
Doug Chausow
|
|
|
Updated street address 117 S 10th St
|
Intake Approval | | | 9/22/2017 | | PASS |
|
|
|
|
Intake Approval | | | 9/15/2017 | | FAIL |
Rob Patrick
|
|
|
9/15/17 Brian: I will need to see the structural engineering data for hanging the AHU and new hood equipment to the existing structure to insure the structure can support them.
|
Intake Approval | | | 9/11/2017 | | FAIL |
Rob Patrick
|
|
|
Brian: Thank you for re-submitting and uploading the new information. A couple items still need to be shown. We will need to see: 1. Roof plan showing connection details for ducting and air units. 2. Connections for hood. 3. Structural engineering data for the connections of the HVAC equipment to the existing structure. Thank you.
|
Intake Approval | | | 9/6/2017 | | FAIL |
Rob Patrick
|
|
|
1. This project will have to be re-submitted on the 520 check list with all the required documents on that list due to the fact that this is a change of use.
2. Project will also be required to be reviewed by the Central District Health Dept.
Yes. Please scan and resubmit that cover sheet. Also, please submit the following:
1. A "completed" 520 Check list sheet and everything on that check list that pertains to the project.
2. A "completed" 304 Design Professional Form.
|
Application received | | | 9/5/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 5 2017 2:56PM
|