Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-03210
StatusFinaled
Name HOBSON FABRICATING CORP
Site Address 4701 S NORTHRUP ST
Project NameValley Regional Transit
Customer Number 
ePlanReviewYes
Description
(VALLEY REGIONAL TRANSIT – GAS DETECTION & HVAC SYSTEM) ***Note: Deferred submittals of the engineering calculation for the new exterior MAU concrete pad, DO NOT FINAL until engineering calculation are submitted and approved for the new exterior MAU concrete pad. *** Permit to redesign the gas detection system and the HVAC system within the existing Bus Maintenance Facility. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of existing gas detection system, removal of HVAC equipment, new mechanical equipment and ductwork, new exterior concrete pad for new MAU, new gas detection system, select shop light fixture relocation, electrical work, plumbing work and mechanical work. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/18/20202/19/20202/19/2020ADONE
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
FIRE-Final Inspection2/17/20202/18/20202/18/2020APASS
DetailsTroy Cobbley
Life safety passed.

Fire Life Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
FIRE-Final Inspection2/14/20202/14/20202/14/2020PFAIL
DetailsTroy Cobbley
The engineer's details for the notification height state the device is to be mounted between 80" and 96". All of the devices have been mounted above the stated limits.


Life safety Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
FIRE-Final Inspection2/12/20202/13/20202/13/2020AFAIL
DetailsTroy Cobbley
Provide city approved plans and the letter from the engineer as discussed for the gas system.

Ryan Phone #: ###-####
BLD-Final2/10/20202/10/20202/11/2020PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
BLD-Final2/7/20202/10/20202/11/2020ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
BLD-Aging Inspection1/27/20201/27/20201/27/2020 NR
DetailsJim Storey
425
BLD-Final12/17/201912/18/201912/18/2019ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Telephone call  3/14/2019 DONE
called to see if Amanda could sent the signed permit back to me-left message on her phone
Telephone call  3/13/2019 DONE
spoke with Jim Dong, he stated that the project should be done by next month. Informed him that there shouldn't be any work going on since they do not have their permit no the approved plans. Told him we need the 302 and 306 from the GC and have this permit paid for right away since they are working
Issue PAID IN FULL permit  3/13/2019 DONE
emailed AMANDAR@HOBSONFAB.COM to sign the permit
Inspection Record Card- Bld  3/13/2019 DONE
Telephone call  3/11/2019 DONE
called jake back informing him that we still need the GC to send in a 302 and 306 and have the permit paid for/picked up by 5pm Friday (15th) since it's pass the date and has had two extensions
Telephone call  2/28/2019 DONE
left a message with jacob, jim's number no longer works, informing him that that permit is going to expire at 5pm today and is welcome to send in a request for a 180 day extension.
Meeting  2/4/2019 DONE
sent email to jim, see documents, stating this permit will expire 2/28/19 and has already had two extensions
Extend Review Timeline  12/17/2018 DONE
Final & 1st approved 180 day extension per Adele. see documents
Meeting  12/12/2018 DONE
Jim Dong sent in request for two 180 day extensions
Meeting  12/11/2018 DONE
sent email to Jim (jd@raymundo.com) recommend to send in a request for two 180 day extensions. see documents
Plan assigned to (JG)8/9/20188/9/201812/6/2018 PASS
DetailsJavier Guzman
1st rev comp, 8/15 L2 VRT BMF HVAC & CNG Redesign ePlan
Routing - PLAN CHECK11/29/2018 12/6/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/6/2018 DONE
Permit Ready to Issue  12/6/2018 DONE
MET AMANDAR@HOBSONFAB.COM
Need
GC Form
Revised Cert of Value
Routing - MECHANICAL11/29/2018 11/29/2018 PASS
DetailsTroy James
Route to Impact Fee Review8/22/20188/25/20188/22/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  8/22/2018 FAIL
DetailsJavier Guzman
Routing - FIRE8/9/20188/9/20188/21/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK8/9/2018 8/18/2018 FAIL
DetailsJavier Guzman
Routing PW Environmental8/9/2018 8/14/2018 PASS
DetailsRick Christenson
Routing - MECHANICAL8/9/2018 8/13/2018 FAIL
DetailsTroy James
Existing gas piping is undersized for the new btu load.
Routing - PLUMBING8/9/2018 8/10/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing8/9/2018 8/10/2018 PASS
DetailsDoug Chausow
Corrected address: 4701 S Northrup St
Routing - PUBLIC WORKS8/9/2018 8/9/2018 PASS
DetailsMorgan Webb
Intake Approval  8/9/2018 PASS
DetailsJavier Guzman
Routing - Design Review8/9/2018 8/9/2018 PASS
DetailsAndrea Tuning
No review required
Intake Approval  9/26/2017 FAIL
DetailsMichael Hanson
Entered by CJW for Michael Hanson
Intake Approval  9/11/2017 FAIL
DetailsMichael Hanson
Entered by CJW for Michael Hanson
Application received  9/6/2017 DONE
Application submitted via PDS Online on Sep 6 2017 4:41PM