BLD-Final | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 11/6/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Energy code compliance | 9/28/2017 | 9/29/2017 | 10/2/2017 | P | PASS |
Brandon Shaw
|
|
|
would like earlier if poss, please call to arrang time // John Magnan Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2017 | 9/29/2017 | 10/2/2017 | P | PASS |
Brandon Shaw
|
|
|
would like earlier if poss, please call to arrang time // John Magnan Phone #: ###-####
|
BLD-Conference | 9/14/2017 | 9/15/2017 | 9/15/2017 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####-please call 15 minutes prior to meet
|
Plan assigned to (JAB) Josh | 9/8/2017 | 9/8/2017 | 9/12/2017 | | PASS |
Josh Bogle
|
|
|
interior remodel, no bearing
|
Routing - PLAN CHECK | 9/12/2017 | | 9/12/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 9/8/2017 | | 9/12/2017 | | PASS |
Troy James
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/12/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/12/2017 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 9/12/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/8/2017 | 9/8/2017 | 9/8/2017 | P | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 9/7/2017 | 9/7/2017 | 9/7/2017 | A | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 9/7/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/7/2017 | | 9/7/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 9/7/2017 | | | |
|
|
|
|