BLD-Final | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | PASS |
Tony Young
|
|
|
Blatton Phone #: ###-####
|
DOC - Permit Finaled | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Tony Young
|
|
|
cof o issued
|
BLD-Final | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | NR |
Tony Young
|
|
|
Call Clayton at number provided for entry. Phone #: ###-#### Inspection requested via web by Clayton Conner,, needs trades passed
|
PubWorks Occupancy Approval | 6/1/2018 | 6/1/2018 | 6/1/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Tony Young
|
|
|
Clayton Phone #: ###-####
|
BLD-Other | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Tony Young
|
|
|
soffits, Clayton Phone #: ###-####
|
BLD-Framing/Rough-in | 1/24/2018 | 1/24/2018 | 1/24/2018 | P | PASS |
Tony Young
|
|
|
Clayton Phone #: ###-####
|
BLD-Framing/Rough-in | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Wall Bracing | 1/11/2018 | 1/12/2018 | 1/12/2018 | A | PASS |
Tony Young
|
|
|
Clayton-please call 30 minutes prior to meet for access Phone #: ###-####,, exterior ok
|
BLD-Wall Bracing | 1/11/2018 | 1/11/2018 | 1/11/2018 | P | PART |
Tony Young
|
|
|
Clayton-please call 30 minutes prior to meet for access Phone #: ###-####,, exterior,, need to nail per plans,, more nailing,, Brad said he would go over it and re-nail as needed
|
BLD-Wall Bracing | 1/10/2018 | 1/11/2018 | 1/11/2018 | A | DEFR |
Tony Young
|
|
|
Clayton-please call 30 minutes prior to meet for access Phone #: ###-####
|
Plan Modification Accepted | | | 1/11/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/11/2018 | | 1/11/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 1/9/2018 | 1/10/2018 | 1/10/2018 | P | NR |
Tony Young
|
|
|
Clayton-please call 30 minutes prior to meet for access Phone #: ###-####,, re nail per plan
|
Issue PAID IN FULL permit | | | 10/23/2017 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2017 | | DONE |
Christina Prado
|
|
|
Called Conner to advise permit is ready and gave fees due
|
OVERRIDE | | | 10/13/2017 | | |
|
|
|
|
Plan assigned to (M_H) | 10/5/2017 | | 10/13/2017 | | DONE |
Michael Hanson
|
|
|
9/26 sfd L2 paper - 1st review completed awaiting email response.
|
Routing - PLAN CHECK | 10/11/2017 | | 10/13/2017 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/13/2017 | | DONE |
Michael Hanson
|
|
|
|
Print Occupancy Form | | | 10/13/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/13/2017 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | | | 10/13/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing - PUBLIC WORKS | | | 10/11/2017 | | PASS |
|
|
|
|
1st review completed | | | 10/10/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 9/7/2017 | 9/7/2017 | 10/5/2017 | | DEFR |
Brian McGowan
|
|
|
9/26 sfd L2 paper
|
Plan Reviewer's activity | | | 10/2/2017 | | DONE |
Michael Hanson
|
|
|
Removed foundation permit value of $18,000. BLD17-03540
10/2/2017 MDH
|
Routing - FIRE | 9/22/2017 | 9/22/2017 | 9/25/2017 | | PASS |
Scott Arellano
|
|
|
Approved as shown. No seperate comments.
|
Routing PW Grading-Hillside | 9/22/2017 | | 9/22/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - Erosion and Sediment | 9/13/2017 | | 9/18/2017 | | PASS |
Andy J. Long
|
|
|
ESC site map with project narrative approved. Valid RP designated; site preparation inspection is required.
|
Plan resubmittals received | | | 9/13/2017 | | DONE |
|
|
|
Three copies of sheet L1.1 Taken to Brian Mc
|
Routing - MECHANICAL | 9/12/2017 | | 9/13/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/12/2017 | | 9/12/2017 | | PASS |
Brent Moore
|
|
|
|
Routing PW Grading-Hillside | 9/8/2017 | | 9/12/2017 | | FAIL |
Melissa Jannusch
|
|
|
Corrections needed see e-mail to applicant dated 9-12-2017. (Subject BLD17-03219 3862 N Sandpoint Way hillside review correction)
|
Routing - PUBLIC WORKS | 9/12/2017 | | 9/12/2017 | | FAIL |
Rachael Beierle
|
|
|
SEE HILLSIDE NOTES
|
Route to Impact Fee Review | 9/7/2017 | 9/10/2017 | 9/8/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/7/2017 | | 9/8/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Sewer Rating | 9/8/2017 | | 9/8/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/7/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/7/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/7/2017 | | DONE |
|
|
|
|
Application received | | 9/7/2017 | | | |
|
|
|
|