Permit Information
Permit NumberBLD17-03219
StatusFinaled
Name CONNER CONSTRUCTION LLC
Site Address 3862 N SANDPOINT WAY
Project Name 
Customer NumberBLD17-03540 FOUNDATION
ePlanReviewNo
Description
***HILLSIDE = IN WUI ZONE "A" REQUIREMENTS*** See BLD17-3540 for foundation only permit previously issued. Permit for the construction of a new 2936 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 315 sq. ft. of covered patio/porch and a 923 sq. ft. attached garage per the approved plans. A-1 zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/14/20186/15/20186/15/2018APASS
DetailsTony Young
Blatton Phone #: ###-####
DOC - Permit Finaled6/15/20186/15/20186/15/2018PPASS
DetailsTony Young
cof o issued
BLD-Final6/11/20186/12/20186/12/2018ANR
DetailsTony Young
Call Clayton at number provided for entry. Phone #: ###-#### Inspection requested via web by Clayton Conner,, needs trades passed
PubWorks Occupancy Approval6/1/20186/1/20186/1/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance1/24/20181/25/20181/25/2018APASS
DetailsTony Young
Clayton Phone #: ###-####
BLD-Other1/24/20181/25/20181/25/2018APASS
DetailsTony Young
soffits, Clayton Phone #: ###-####
BLD-Framing/Rough-in1/24/20181/24/20181/24/2018PPASS
DetailsTony Young
Clayton Phone #: ###-####
BLD-Framing/Rough-in1/18/20181/19/20181/19/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Wall Bracing1/11/20181/12/20181/12/2018APASS
DetailsTony Young
Clayton-please call 30 minutes prior to meet for access Phone #: ###-####,, exterior ok
BLD-Wall Bracing1/11/20181/11/20181/11/2018PPART
DetailsTony Young
Clayton-please call 30 minutes prior to meet for access Phone #: ###-####,, exterior,, need to nail per plans,, more nailing,, Brad said he would go over it and re-nail as needed
BLD-Wall Bracing1/10/20181/11/20181/11/2018ADEFR
DetailsTony Young
Clayton-please call 30 minutes prior to meet for access Phone #: ###-####
Plan Modification Accepted  1/11/2018 DONE
new manual j report
Routing - MECHANICAL1/11/2018 1/11/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing1/9/20181/10/20181/10/2018PNR
DetailsTony Young
Clayton-please call 30 minutes prior to meet for access Phone #: ###-####,, re nail per plan
Issue PAID IN FULL permit  10/23/2017 DONE
DetailsChristina Prado
Inspection Record Card- Bld  10/16/2017 DONE
Telephone call  10/16/2017 DONE
DetailsChristina Prado
Called Conner to advise permit is ready and gave fees due
OVERRIDE  10/13/2017  
Plan assigned to (M_H)10/5/2017 10/13/2017 DONE
DetailsMichael Hanson
9/26 sfd L2 paper - 1st review completed awaiting email response.
Routing - PLAN CHECK10/11/2017 10/13/2017 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  10/13/2017 DONE
Case Summary (BLD)  10/13/2017 DONE
DetailsMichael Hanson
Print Occupancy Form  10/13/2017 DONE
Permit Ready to Issue  10/13/2017 DONE
met
Routing - PLAN CHECK  10/13/2017 PASS
DetailsBrian McGowan
Routing - PUBLIC WORKS  10/11/2017 PASS
1st review completed  10/10/2017  
Plan assigned to (BJM)9/7/20179/7/201710/5/2017 DEFR
DetailsBrian McGowan
9/26 sfd L2 paper
Plan Reviewer's activity  10/2/2017 DONE
DetailsMichael Hanson
Removed foundation permit value of $18,000. BLD17-03540
10/2/2017 MDH
Routing - FIRE9/22/20179/22/20179/25/2017 PASS
DetailsScott Arellano
Approved as shown. No seperate comments.
Routing PW Grading-Hillside9/22/2017 9/22/2017 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing - Erosion and Sediment9/13/2017 9/18/2017 PASS
DetailsAndy J. Long
ESC site map with project narrative approved. Valid RP designated; site preparation inspection is required.
Plan resubmittals received  9/13/2017 DONE
Three copies of sheet L1.1 Taken to Brian Mc
Routing - MECHANICAL9/12/2017 9/13/2017 PASS
DetailsTroy James
Routing - PLANNING9/12/2017 9/12/2017 PASS
DetailsBrent Moore
Routing PW Grading-Hillside9/8/2017 9/12/2017 FAIL
DetailsMelissa Jannusch
Corrections needed see e-mail to applicant dated 9-12-2017. (Subject BLD17-03219 3862 N Sandpoint Way hillside review correction)
Routing - PUBLIC WORKS9/12/2017 9/12/2017 FAIL
DetailsRachael Beierle
SEE HILLSIDE NOTES
Route to Impact Fee Review9/7/20179/10/20179/8/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing9/7/2017 9/8/2017 PASS
DetailsDoug Chausow
Routing PW Sewer Rating9/8/2017 9/8/2017 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  9/7/2017 DONE
Intake Approval  9/7/2017 PASS
Recd Pcfee & Taken To Pln CK  9/7/2017 DONE
Application received 9/7/2017