BLD-Final | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | DONE |
Tony Young
|
|
|
Inspection requested via web by Justin Brewer
|
DOC - Permit Finaled | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 7/21/2020 | 7/22/2020 | 7/22/2020 | P | NH |
Tony Young
|
|
|
Inspection requested via web by Justin Brewer// no answer at door.. no phone #// needs mech final on gas?
|
BLD-Aging Inspection | 2/8/2018 | 2/8/2018 | 2/13/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Footing | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | PASS |
Brandon Shaw
|
|
|
OK to pour pool only
|
PubWorks Subgrade Approval | 9/20/2017 | 9/20/2017 | 9/20/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 9/12/2017 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 9/7/2017 | 9/7/2017 | 9/12/2017 | | PASS |
Josh Bogle
|
|
|
pool - hillside
|
Issue PAID IN FULL permit | | | 9/12/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/12/2017 | | 9/12/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/12/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 9/12/2017 | | DONE |
|
|
|
|
Routing Walk-In (Erosion) | 9/11/2017 | 9/11/2017 | 9/11/2017 | A | DONE |
Andy J. Long
|
|
|
|
Routing Walk-In (BLD) | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 9/7/2017 | | 9/11/2017 | | PASS |
Melissa Jannusch
|
|
|
Permit for pool only. Driveway, deck, and stairs not approved under this permit.
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
Routing - Erosion and Sediment | 9/11/2017 | | 9/11/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan for pool construction only approved. RP for Gem Gunite designated. Valid PD. Site preparation inspection required to inspect BMPs for pool project.
|
Routing Walk-In (Zoning) | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | FAIL |
Josh Bogle
|
|
|
took in for level 2
|
1st review completed | | | 9/7/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | 9/7/2017 | | | |
|
|
|
|