BLD-Final | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PASS |
Jim Sly
|
|
|
I can be there after 1:00. Thanks. Steve If you could let me know where I fit into your schedule, That would be great. Thanks! Phone #: ###-#### Inspection requested via web by Steve Herring
|
DOC - Permit Finaled | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 2/27/2018 | 2/27/2018 | 3/2/2018 | | CANC |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 10/16/2017 | 10/16/2017 | 10/16/2017 | P | PASS |
Jim Sly
|
|
|
Framing for a greenhouse Phone #: ###-#### Inspection requested via web by Steve Herring
|
Routing Walk-In (BLD) | 9/18/2017 | 9/18/2017 | 9/18/2017 | P | FAIL |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 9/18/2017 | 9/18/2017 | 9/18/2017 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/18/2017 | | 9/18/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/18/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2017 | | DONE |
Brian McGowan
|
|
|
Nominal (1) hour of time to be charged.
|
Permit Ready to Issue | | | 9/18/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/18/2017 | | |
|
|
|
|
(F) Reprint permit | | | 9/18/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/18/2017 | | 9/18/2017 | | FAIL |
Brian McGowan
|
|
|
The project was stamped and signed by an Engineer. Changes to the structure must be stamped and signed by the Engineer. He had not notified the Engineer of the changes he was proposing.
|
Routing Walk-In (Zoning) | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Jeff Lowe
|
|
|
approved via CZC17-00113
|
Routing Walk-In (BLD) | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 9/7/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/7/2017 | | 9/7/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/7/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 9/7/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/7/2017 | | DONE |
|
|
|
|
Application received | | 9/7/2017 | | | |
|
|
|
|