BLD-Final | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.8
|
PubWorks Occupancy Approval | 6/13/2018 | 6/13/2018 | 6/13/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Blower Door Test Results | 6/8/2018 | 6/12/2018 | 6/12/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Final | 6/8/2018 | 6/12/2018 | 6/12/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Final | 5/8/2018 | 5/10/2018 | 5/10/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Blower Door Test Results | 5/10/2018 | 5/10/2018 | 5/10/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50 4.6
|
BLD-Energy code compliance | 2/19/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 2/15/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Brandon Shaw
|
|
|
Shear // Ever Phone #: ###-####
|
BLD-Foundation | 12/4/2017 | 12/5/2017 | 12/5/2017 | P | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 11/30/2017 | 12/1/2017 | 12/1/2017 | P | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 11/30/2017 | 11/30/2017 | 11/30/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 11/2/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/2/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/2/2017 | | DONE |
|
|
|
met-i attached the sign off card in e plan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2017 | | DONE |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 10/9/2017 | | 10/16/2017 | | DONE |
Michael Hanson
|
|
|
1st review completed sent to Brian for review.
|
Routing - PLAN CHECK | 9/11/2017 | | 10/16/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 10/12/2017 | | DONE |
Michael Hanson
|
|
|
|
Plan Reviewer's activity | | | 10/12/2017 | | DONE |
Michael Hanson
|
|
|
|
Routing - FIRE | 9/11/2017 | 9/11/2017 | 9/20/2017 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing PW Grading-Hillside | 9/11/2017 | | 9/20/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Route to Impact Fee Review | 9/11/2017 | 9/14/2017 | 9/14/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Erosion and Sediment | 9/11/2017 | | 9/14/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with site map and narrative approved. Valid PD and RP designated. Site preparation inpsection required.
|
Routing - MECHANICAL | 9/11/2017 | | 9/13/2017 | | PASS |
Troy James
|
|
|
|
Plan assigned to (BJM) | 9/11/2017 | 9/11/2017 | 9/11/2017 | | DEFR |
Brian McGowan
|
|
|
9/28 sfd L2 ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 9/11/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/11/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/11/2017 | | PASS |
|
|
|
|
Routing - Addressing | 9/11/2017 | | 9/11/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/11/2017 | | 9/11/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 9/11/2017 | | 9/11/2017 | | PASS |
Jeff Lowe
|
|
|
|
Application received | | | 9/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 8 2017 9:55AM
|