BLD-Framing/Rough-in | 9/26/2017 | 9/26/2017 | 9/26/2017 | P | PASS |
Dave Hannah
|
|
|
Bolts for decking - Jim Phone #: ###-####
|
BLD-Footing | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PASS |
Dave Hannah
|
|
|
James Phone #: ###-####
|
Routing Walk-In (Zoning) | 9/8/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Jeff Lowe
|
|
|
no hillside required per MJ.
|
Routing Walk-In (BLD) | 9/8/2017 | 9/8/2017 | 9/8/2017 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 9/8/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/8/2017 | | 9/8/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/8/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/8/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/8/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/8/2017 | | DONE |
|
|
|
|
Application received | | 9/8/2017 | | | |
|
|
|
|