BLD-Final | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 4/19/2018 | 4/19/2018 | 4/19/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 2/7/2018 | 2/7/2018 | 2/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Soffits
|
BLD-Energy code compliance | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Framing/Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | CANC |
Brandon Shaw
|
|
|
Ok to insulate
|
BLD-Wall Bracing | 12/19/2017 | 12/19/2017 | 12/19/2017 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PART |
Jim Storey
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connellwip ok set backs
|
PubWorks Subgrade Approval | 10/19/2017 | 10/19/2017 | 10/19/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 10/10/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/6/2017 | | |
|
|
|
|
Routing - FIRE | 10/6/2017 | 10/6/2017 | 10/6/2017 | | PASS |
Erika Akin
|
|
|
Plans reviewed for FD access, hydrant availability and defensible space
|
Permit Ready to Issue | | | 10/6/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/29/2017 | 9/29/2017 | 10/5/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 9/05 sfd L2 eplan
|
Routing - PLAN CHECK | 10/5/2017 | | 10/5/2017 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2017 | | DONE |
|
|
|
|
1st review completed | | | 9/30/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/12/2017 | | 9/30/2017 | | FAIL |
Javier Guzman
|
|
|
|
Plan assigned to (BJM) | 9/12/2017 | 9/12/2017 | 9/29/2017 | | DEFR |
Brian McGowan
|
|
|
9/05 sfd L2 eplan
|
Routing - MECHANICAL | 9/12/2017 | | 9/19/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 9/12/2017 | | 9/15/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Route to Impact Fee Review | 9/12/2017 | 9/15/2017 | 9/14/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 9/12/2017 | | 9/12/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 9/12/2017 | | 9/12/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/12/2017 | | 9/12/2017 | | PASS |
Rachael Beierle
|
|
|
|
Telephone call | | | 9/12/2017 | | DONE |
|
|
|
called Chelsea-don't see the soils and geo reports
|
Plans ACCEPTED BY PLAN TECH | | | 9/12/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/12/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/12/2017 | | DONE |
|
|
|
|
Application received | | | 9/11/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 11 2017 11:09AM
|
Intake Approval | | | 9/11/2017 | | FAIL |
|
|
|
Missing Soils and Geo Report
|