BLD-Final | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | PASS |
Dave Hannah
|
|
|
call 15 mins ahead- Jessica Phone #: ###-####
|
DOC - Permit Finaled | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 1/29/2018 | 1/30/2018 | 1/31/2018 | P | PEND |
Dave Hannah
|
|
|
Call half hour before to meet // Jessica Phone #: ###-#### needs to hard wire smoke and co2 detectors
|
BLD-Final | 1/25/2018 | 1/25/2018 | 1/26/2018 | P | NH |
Dave Hannah
|
|
|
Call 15 mins ahead for access- Jessica Phone #: ###-#### (any building questions call Clint ###-####
|
BLD-Framing/Rough-in | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Dave Hannah
|
|
|
call 10 mins ahead- Zach Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2017 | 10/24/2017 | 10/24/2017 | P | FAIL |
Dave Hannah
|
|
|
Rock Phone #: ###-#### needs plumbing r/i and engineering on ceiling joist connection to beam that was cut back to far
|
Routing Walk-In (BLD) | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/25/2017 | | 9/25/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/25/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/25/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/25/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | FAIL |
Josh Bogle
|
|
|
needed more structural information
|
1st review completed | | | 9/19/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/19/2017 | | 9/19/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 9/15/2017 | 9/15/2017 | 9/15/2017 | P | FAIL |
Brian McGowan
|
|
|
Needs to provide existing floor plan layout, indicate structure or possible structure in order to verify bearing or non bearing walls.
Window sizes, additional notes required as well.
|
1st review completed | | | 9/15/2017 | | FAIL |
Brian McGowan
|
|
|
Needs to provide existing floor plan layout, indicate structure or possible structure in order to verify bearing or non bearing walls.
Window sizes, additional notes required as well.
|
Routing - PLAN CHECK | 9/15/2017 | | 9/15/2017 | | FAIL |
Brian McGowan
|
|
|
Needs to provide existing floor plan layout, indicate structure or possible structure in order to verify bearing or non bearing walls.
Window sizes, additional notes required as well.
|
Application received | | 9/15/2017 | | | |
|
|
|
|