Case Summary (BLD) | | | 8/24/2018 | | DONE |
|
|
|
|
BLD-Final | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Dave Hannah
|
|
|
Dusty Phone #: ###-####
|
DOC - Permit Finaled | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PEND |
Dave Hannah
|
|
|
Clint Phone #: ###-#### needs ladders in windowwells
|
BLD-Aging Inspection | 3/16/2018 | 3/16/2018 | 3/16/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 12/4/2017 | 12/5/2017 | 12/5/2017 | A | CANC |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
Plan assigned to (JAB) Josh | 11/21/2017 | 11/21/2017 | 11/29/2017 | | PASS |
Josh Bogle
|
|
|
MOD for deck - failed - needs footing engineering, Hillside
|
Plan resubmittals received | | | 11/29/2017 | | DONE |
|
|
|
Two copies of sheets 1 through 6 taken to Josh
|
Routing - PLAN CHECK | 11/29/2017 | | 11/29/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2017 | | DONE |
Josh Bogle
|
|
|
no mod fee - quick & easy
|
CHANGE STATUS TO (ISS) | | | 11/29/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/21/2017 | | 11/27/2017 | | FAIL |
Josh Bogle
|
|
|
needs footing engineering - Hillside
|
Routing Walk-In (Zoning) | 11/21/2017 | 11/21/2017 | 11/21/2017 | A | PASS |
Jeff Lowe
|
|
|
taxing district line, not parcel line, runs through property. Pending approval of City PE
|
Routing PW Grading-Hillside | 11/21/2017 | | 11/21/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
Plan resubmittals requested | | | 11/21/2017 | | DONE |
|
|
|
Add a patio
|
BLD-Energy code compliance | 11/2/2017 | 11/2/2017 | 11/2/2017 | A | PASS |
Dave Hannah
|
|
|
call when on your way - Zach Phone #: ###-####
|
BLD-Framing/Rough-in | 11/1/2017 | 11/1/2017 | 11/2/2017 | P | PART |
Dave Hannah
|
|
|
call when on your way - Zach Phone #: ###-####
|
BLD-Framing/Rough-in | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | PART |
Dave Hannah
|
|
|
Zach Phone #: ###-#### up stairs ok to cover
|
BLD-Framing/Rough-in | 10/30/2017 | 10/30/2017 | 10/31/2017 | P | PART |
Dave Hannah
|
|
|
Call half hour before // Zack Phone #: ###-#### ok to insulate up stairs
|
CHANGE STATUS TO (ISS) | | | 10/25/2017 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JAB) Josh | 10/16/2017 | 10/16/2017 | 10/16/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/16/2017 | | 10/16/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2017 | | DONE |
Josh Bogle
|
|
|
Modification, updated tall-wall engineering - no fee JAB
|
Inspection Record Card- Bld | | | 10/16/2017 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/16/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for plan mod - no fee per JAB
DO NOT RE-ISSUE
|
Plan resubmittals received | | | 10/13/2017 | | DONE |
|
|
|
Received (2) copies full sized plan sheets 1, 2, 3, 4, 5, 6 and structural calculations.
|
Permit Ready to Issue | | | 10/3/2017 | | DONE |
|
|
|
met
|
Telephone call | | | 10/3/2017 | | DONE |
|
|
|
called Zachd to let know permit is ready and how much is owed
|
Issue PAID IN FULL permit | | | 10/3/2017 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 9/26/2017 | 9/26/2017 | 10/2/2017 | | PASS |
Josh Bogle
|
|
|
1st done
|
Plan resubmittals received | | | 10/2/2017 | | DONE |
|
|
|
resubmittals recieved 2 of each: sheets 1-6 and eng calcs-took to JAB
|
Routing - PLAN CHECK | 10/2/2017 | | 10/2/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/2/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/2/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Routing - PLAN CHECK | 9/27/2017 | | 9/27/2017 | | FAIL |
Josh Bogle
|
|
|
needs tall-wall eng. & missing details, e-mail 9-27-17 JAB
|
Routing Walk-In (BLD) | 9/26/2017 | 9/26/2017 | 9/26/2017 | P | FAIL |
Josh Bogle
|
|
|
took in as level 2, need more time for review JAB
|
Routing Walk-In (BLD) | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | FAIL |
Josh Bogle
|
|
|
no contact with applicant on this plan
|
Routing Walk-In (BLD) | 9/15/2017 | 9/15/2017 | 9/15/2017 | P | FAIL |
Brian McGowan
|
|
|
Needs to provide existing floor plan layout, indicate structure or possible structure in order to verify bearing or non bearing walls.
Window sizes, additional notes required as well.
|
1st review completed | | | 9/15/2017 | | FAIL |
Brian McGowan
|
|
|
Needs to provide existing floor plan layout, indicate structure or possible structure in order to verify bearing or non bearing walls.
Window sizes, additional notes required as well.
|
Routing - PLAN CHECK | 9/15/2017 | | 9/15/2017 | | FAIL |
Brian McGowan
|
|
|
Needs to provide existing floor plan layout, indicate structure or possible structure in order to verify bearing or non bearing walls.
Window sizes, additional notes required as well.
|
Application received | | 9/15/2017 | | | |
|
|
|
|