Permit Information
Permit NumberBLD17-03337
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2397 S TRAPPER PL
Project NameHN 8-1 Ridgeview
Customer Number 
ePlanReviewYes
Description
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 2415 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 123 sq. ft. of covered patio/porch and a 736 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. ***BJM***
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/14/20186/14/20186/14/2018PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
DOC - Permit Finaled6/14/20186/14/20186/14/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results6/14/20186/14/20186/14/2018PDONE
DetailsBrandon Shaw
ACH50- 3.56
PubWorks Occupancy Approval6/14/20186/14/20186/14/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Other3/21/20183/22/20183/22/2018APASS
DetailsBrandon Shaw
Rollo-soffit Phone #: ###-####
BLD-Energy code compliance3/14/20183/14/20183/14/2018PPASS
DetailsBrandon Shaw
Austin Phone #: ###-####
BLD-Framing/Rough-in3/9/20183/12/20183/12/2018APASS
DetailsBrandon Shaw
Auston Phone #: ###-####
BLD-Wall Bracing2/21/20182/21/20182/21/2018PPASS
DetailsBrandon Shaw
Shear // Rolo Phone #: ###-####
BLD-Foundation12/27/201712/27/201712/27/2017PPASS
DetailsBrandon Shaw
Work in progress

Frost protection required
BLD-Footing12/21/201712/21/201712/21/2017PPASS
DetailsJim Sly
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
PubWorks Subgrade Approval12/5/201712/5/201712/5/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  10/20/2017  
Plan assigned to (BJM)9/19/20179/19/201710/20/2017 DONE
DetailsBrian McGowan
10/05 sfd L2 ePlan
Routing - PLAN CHECK9/19/2017 10/20/2017 PASS
DetailsBrian McGowan
Issue PAID IN FULL permit  10/20/2017 DONE
Inspection Record Card- Bld  10/20/2017 DONE
1st review completed  10/20/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  10/20/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  10/20/2017 DONE
All Met
Routing - FIRE9/19/20179/19/20179/25/2017 PASS
DetailsScott Arellano
No comments attached.
Route to Impact Fee Review9/19/20179/22/20179/21/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Grading-Hillside9/19/2017 9/21/2017 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing - MECHANICAL9/19/2017 9/20/2017 PASS
DetailsTroy James
Routing - PLANNING9/19/2017 9/19/2017 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS9/19/2017 9/19/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment9/19/2017 9/19/2017 PASS
DetailsAndy J. Long
Certified RP and PD provided, ESC plan with site map and project narrative. Site preparation inspection is required.
Routing - Addressing9/19/2017 9/19/2017 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  9/19/2017 DONE
Recd Pcfee & Taken To Pln CK  9/19/2017 DONE
Intake Approval  9/19/2017 PASS
Application received  9/18/2017 DONE
Application submitted via PDS Online on Sep 18 2017 2:06PM