BLD-Blower Door Test Results | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Tony Young
|
|
|
4.5
|
DOC - Permit Finaled | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
DOC - Permit Finaled | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 3/2/2018 | 3/2/2018 | 3/4/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD-Framing/Rough-in | 3/1/2018 | 3/1/2018 | 3/1/2018 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart,, see paint,, straps, toenails,, ok to insulate
|
BLD-Wall Bracing | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Tony Young
|
|
|
Shea // jorge Phone #: ###-####
|
BLD-Footing | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-#### Soil test done by All West testing and Engineering. Approved for pour. In addition ......Contractor widened footings from 16" to 18". and added 2 rows #4 horizontal rebars in footing.
|
BLD-Conference | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | PEND |
Tony Young
|
|
|
Pat Phone #: ###-####,, soils report?
|
BLD-Conference | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | NR |
Tony Young
|
|
|
Pat Phone #: ###-####,, soils report?
|
BLD-Footing | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PEND |
Tony Young
|
|
|
Pat Phone #: ###-####,, need an ok for the soils as built,, loose sand in some areas
|
BLD-Footing | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | NR |
Tony Young
|
|
|
Pat Phone #: ###-####,, correction notice posted,, need soils report due to debris and loose soils
|
Issue PAID IN FULL permit | | | 10/20/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/20/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/19/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 10/19/2017 | | DONE |
|
|
|
met
|
Plan assigned to (M_H) | 10/17/2017 | | 10/18/2017 | | DONE |
Michael Hanson
|
|
|
10/02 sfd L1 ePlan - 1st review completed 10/18 MDH
|
Plan Reviewer's activity | | | 10/18/2017 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 10/18/2017 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2017 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 9/19/2017 | | 10/18/2017 | | PASS |
Brian McGowan
|
|
|
|
Route to Impact Fee Review | 9/19/2017 | 9/22/2017 | 9/21/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 9/19/2017 | | 9/20/2017 | | PASS |
Troy James
|
|
|
|
Application received | | | 9/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 19 2017 10:05AM
|
Plan assigned to (BJM) | 9/19/2017 | 9/19/2017 | 9/19/2017 | | DEFR |
Brian McGowan
|
|
|
10/02 sfd L1 ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 9/19/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/19/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/19/2017 | | PASS |
|
|
|
|
Routing - PLANNING | 9/19/2017 | | 9/19/2017 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 9/19/2017 | | 9/19/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/19/2017 | | 9/19/2017 | | PASS |
Rachael Beierle
|
|
|
|