(D & B SUPPLY – RACKING) The fire sprinkler system is used for building area increase and for fire area. Tenant improvement work was done under permit BLD17-01694. To install (1) several 14 foot tall steel storage racks (storage 12 feet tall maximum) with shelves at 4.5 and 8.5 feet, (2) several 14 foot tall steel storage racks (storage 12 feet tall maximum) with shelves at 3, 6 and 9 feet, and (3) several 14 foot tall steel storage racks (storage 12 feet tall maximum) with shelves at 11 feet and “Lozier” display shelves installed below within an existing 3,292 square foot storage room located at the back of a 29,943 square foot retail sales room. The racks will be attached to the existing concrete floor using Power-Stud+ SD2 1/2 inch expansion anchors embedded at least 3.75 inches into the concrete floor. Two (2) anchors per foot plate are required. Periodic Special Inspection is required during anchor installation. The provisions of ICC Evaluation Report ESR-2502 are required to be followed. To install several 10 foot tall “Lozier” display shelves next to the North and West walls of the 29,943 square foot retail sales room. Hilti Kwik HUS–EZ 1/4" screw anchors installed per ESR-3027 and embedded at least 2.5 inches at all anchor / upright locations are required. Periodic Special Inspection is required during anchor installation. Other shelves do not exceed 8 feet tall. The racks and their installation are required to comply with RMI/ANSI MH 16.1-2008. The work is required to comply with the approved drawings, with the structural design, and with all applicable codes and ordinances. The configuration and width of aisles are required to comply with the approved drawings. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  4/4/2018 DONE
Paper drawings taken to records
Third Notice 1/17/20182/12/2018 DONE
Mailed 2-13-18
Third Notice 12/17/20171/12/2018 DONE
Mailed 1-12-18
Second Notice 11/24/201712/12/2017 DONE
Mailed 12-13-17
First Notice10/31/201710/31/201711/14/2017 DONE
DetailsJim Storey
Mailed 11-15-17
FIRE-Final Inspection11/6/201711/6/201711/6/2017ADONE
DetailsBrittany Hill
Life saftey for racking complete per Jim Page
BLD-Final10/30/201710/31/201710/31/2017APASS
DetailsJim Storey
Brandt Phone #: ###-####
DOC - Permit Finaled10/31/201710/31/201710/31/2017PPASS
DetailsJim Storey
Permit Ready to Issue  10/13/2017 DONE
Need:
Revised Value
GC form
Inspection Record Card- Bld  10/13/2017 DONE
Telephone call  10/13/2017 DONE
Spoke with Doug informing him that this permit is ready just need the GC to fill out a 302 and 306 so we could put the rest of the fees in
Issue PAID IN FULL permit  10/13/2017 DONE
Plan assigned to (CJW)9/19/20179/19/201710/12/2017 PASS
DetailsCarl Westfall
(1st done) (Sept 21 - 3 days) Racking
Routing - PLAN CHECK10/6/2017 10/12/2017 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  10/12/2017 DONE
Routing - FIRE10/12/2017 10/12/2017 PASS
DetailsTim Frost
Plan resubmittals received  10/11/2017 DONE
One copy of Building Permit Fire Code Plan Review packet, two copies of B.P.F.C.P.R. Response, Two copies of sheets Emergency lighting and Lozier Map Sales Floor. Taken to Carl W
Routing - FIRE10/3/2017 10/6/2017 FAIL
DetailsTim Frost
Assigned to Tim Frost
1st review completed  10/6/2017 DONE
Routing - PLAN CHECK9/19/2017 10/3/2017 PASS
DetailsCarl Westfall
Plans ACCEPTED BY PLAN TECH  9/19/2017 DONE
Intake Approval  9/19/2017 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  9/19/2017 DONE
Application received 9/19/2017