BLD-Final | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Brandon Shaw
|
|
|
Phil Phone #: ###-####
|
DOC - Permit Finaled | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Phil Phone #: ###-####
|
BLD-Framing/Rough-in | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
Plan Modification Accepted | | | 1/26/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/26/2018 | | 1/26/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | PASS |
Brandon Shaw
|
|
|
Phil Phone #: ###-####
|
BLD-Foundation | 12/28/2017 | 12/28/2017 | 12/28/2017 | A | PASS |
Brandon Shaw
|
|
|
Previous inspection and notes errorr. Foundation- rebar, anchors, and hold downs are OK.
|
BLD-Foundation | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | FAIL |
Brandon Shaw
|
|
|
See correction notice
OK to insulate
|
BLD-Footing | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PASS |
Brandon Shaw
|
|
|
Phil Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/24/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2017 | | DONE |
|
|
|
called John (Sara) to let know permit is ready and how much is owed-left message on phone
|
OVERRIDE | | | 10/16/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2017 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JCB) | 10/11/2017 | | 10/16/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/16/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/16/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/16/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - PLAN CHECK | 9/26/2017 | | 10/16/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 9/20/2017 | | 9/26/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/19/2017 | 9/22/2017 | 9/21/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 9/20/2017 | | 9/20/2017 | | PASS |
Sue Cummings
|
|
|
See redlines on site plan. Driveway is not to excede 33 ft. wide in front setback.
|
Routing - Addressing | 9/19/2017 | | 9/20/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 9/20/2017 | | PASS |
|
|
|
|
Plan assigned to (BJM) | 9/19/2017 | 9/19/2017 | 9/19/2017 | | DEFR |
Brian McGowan
|
|
|
10/02 sfd L1 paper
|
Plans ACCEPTED BY PLAN TECH | | | 9/19/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/19/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/19/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 9/19/2017 | | | |
|
|
|
|