BLD-Final | 12/27/2017 | 12/28/2017 | 12/29/2017 | A | PASS |
Dave Hannah
|
|
|
Andrea Phone #: ###-####
|
DOC - Permit Finaled | 12/29/2017 | 12/29/2017 | 12/29/2017 | P | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 10/17/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/22/2017 | | |
|
|
|
|
Telephone call | | | 9/22/2017 | | DONE |
|
|
|
called Andrea to let know permit is ready-how much is owed and that we need the sewer cap
|
Permit Ready to Issue | | | 9/22/2017 | | DONE |
|
|
|
need sewer cap-bond on file-
|
Routing - Erosion and Sediment | 9/20/2017 | | 9/20/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Valid RP designated. No site preparation inspection required. Post ESC permit sign
|
First Notice | 12/29/2017 | 12/29/2017 | | | |
Dave Hannah
|
|
|
|
Application received | | 9/20/2017 | | | |
|
|
|
|