Permit Information
Permit NumberBLD17-03387
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2929 S GREBE PL
Project NameHN 66-1 HIGHLAND
Customer Number 
ePlanReviewYes
Description
*** HILLSIDE, WUI ZONE "A" REQUIREMENTS CLASS "A" ROOF / 1 HOUR SOFFITS / NON-COMBUSTIBLE EXTERIOR*** Permit for the construction of a new 3609 sq. ft., two story (first story 1894 sq. ft., second story 1715 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 374 sq. ft. of covered patio/porch and a 990 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/17/20185/18/20185/18/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Weston Wagner
DOC - Permit Finaled5/18/20185/18/20185/18/2018PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval5/18/20185/18/20185/18/2018 DONE
DetailsJason C. Taylor
BLD-Final5/17/20185/18/20185/17/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Weston Wagner Inspection cancelled from web by: Weston Wagner
BLD-Other3/2/20183/5/20183/5/2018APASS
DetailsBrandon Shaw
soffit // rolo Phone #: ###-####
BLD-Other2/28/20183/1/20183/1/2018AFAIL
DetailsBrandon Shaw
Seams and joints need to be tighten up or fire caulked
Not complete
BLD-Energy code compliance2/16/20182/20/20182/20/2018APASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Energy code compliance2/16/20182/16/20182/16/2018APASS
DetailsBrandon Shaw
BLD-Framing/Rough-in2/15/20182/16/20182/16/2018APASS
DetailsBrandon Shaw
Shear corrections and revised Engineering- SAT
BLD-Framing/Rough-in2/8/20182/9/20182/9/2018AFAIL
DetailsBrandon Shaw
See correction notice
Need revised Engineering
BLD-Wall Bracing1/25/20181/26/20181/26/2018AFAIL
DetailsBrandon Shaw
See correction notice
BLD-Foundation12/7/201712/7/201712/7/2017PPASS
DetailsBrandon Shaw
Work in progress

Thermal protection required
BLD-Footing12/4/201712/5/201712/5/2017PPASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
PubWorks Subgrade Approval11/14/201711/14/201711/14/2017 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  11/8/2017  
Issue PAID IN FULL permit  11/8/2017 DONE
Inspection Record Card- Bld  11/8/2017 DONE
Plan assigned to (M_H)10/26/2017 11/8/2017 DONE
DetailsMichael Hanson
10/12 sfd L2 ePlan - 1st review complete sent to hillside for review. 10/26 MDH
Routing - PLAN CHECK11/6/2017 11/8/2017 PASS
DetailsBrian McGowan
Plan Reviewer's activity  11/8/2017 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  11/8/2017 DONE
DetailsMichael Hanson
Permit Ready to Issue  11/8/2017 DONE
met
Routing - PLAN CHECK11/6/2017 11/6/2017 FAIL
DetailsBrian McGowan
Structural load path shifted, foundation footing needs to shift with them. MDH
1st review completed  11/2/2017 FAIL
DetailsMichael Hanson
Returned to applicant for structural. MDH
Routing - PLAN CHECK9/25/2017 11/2/2017 FAIL
DetailsBrian McGowan
Verify beams and structure
Routing PW Grading-Hillside9/25/2017 10/31/2017 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - FIRE9/25/20179/25/20179/29/2017 PASS
DetailsScott Arellano
No comments attached. This structure has been evaluated for FD vehicle access, water supply, and defensible space.
Route to Impact Fee Review9/25/20179/28/20179/27/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment9/25/2017 9/27/2017 PASS
DetailsAndy J. Long
ESC plan approved. Site preparation inspection required.
Routing - MECHANICAL9/25/2017 9/26/2017 PASS
DetailsTroy James
Plan assigned to (BJM)9/25/20179/25/20179/25/2017 DEFR
DetailsBrian McGowan
10/12 sfd L2 ePlan
Intake Approval  9/25/2017 PASS
Plans ACCEPTED BY PLAN TECH  9/25/2017 DONE
Recd Pcfee & Taken To Pln CK  9/25/2017 DONE
Routing - PLANNING9/25/2017 9/25/2017 PASS
DetailsSue Cummings
Routing - Addressing9/25/2017 9/25/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/25/2017 9/25/2017 PASS
DetailsMorgan Webb
Application received  9/21/2017 DONE
Application submitted via PDS Online on Sep 21 2017 8:48AM