BLD-Aging Inspection | 5/3/2018 | 5/3/2018 | 5/3/2018 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 12/19/2017 | 12/20/2017 | 12/20/2017 | A | PASS |
Jim Storey
|
|
|
Insulation inspection Phone #: ###-#### Inspection requested via web by Kathryn Martin
|
Meeting | | | 10/26/2017 | | DONE |
|
|
|
parcel owner came in-said she let the GC go and now she wants to be the GC-GC form is in the docs as well as the letter stating she was taking over the permit
|
(F) Reprint permit | | | 10/26/2017 | | DONE |
|
|
|
|
BLD-Footing | 9/28/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Jim Storey
|
|
|
Rickie Phone #: ###-####
|
OVERRIDE | | | 9/22/2017 | | |
|
|
|
|
BLD-Footing | 9/22/2017 | 9/25/2017 | 9/22/2017 | A | CANC |
Jim Storey
|
|
|
Ricky Phone #: ###-####// Ricky called to cancel, will call back when ready 9/22/17//leg
|
Routing Walk-In (BLD) | 9/22/2017 | 9/22/2017 | 9/22/2017 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/22/2017 | | 9/22/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/22/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/22/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 9/22/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/22/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 9/21/2017 | 9/21/2017 | 9/21/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/21/2017 | 9/21/2017 | 9/21/2017 | A | FAIL |
Josh Bogle
|
|
|
plans lacking build details
|
1st review completed | | | 9/21/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/21/2017 | | 9/21/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 9/21/2017 | | | |
|
|
|
|