Permit Information
Permit NumberBLD17-03394
StatusFinaled
Name BENCHMARK DEVELOPMENT COMPANY LLC
Site Address 3764 W TWILIGHT DR
Project NameLane Residence
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION 7-30-19 - GRADING AND DRAINAGE, Eliminating one set of landscape stairs and modifying the remaining set of landscape stairs.** ""WUI ZONE A REQUIREMENTS"" Permit for the construction of a new 3040 sq. ft., two story (first story 1058 sq. ft., second story 950 sq. ft. basement 1032 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 521 sq. ft. of covered patio/porch and a 586 sq. ft. attached garage per the approved plans, plan review report and any notations. Special inspections required per the attached form 310. R-1C zoning and setbacks per planning.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  11/12/2019 DONE
Per BLD Final Inspection on 9/4/19
BLD-Final9/4/20199/4/20199/4/2019PDONE
DetailsTony Young
Tim Phone #: ###-####
BLD-Final9/3/20199/4/20199/4/2019APASS
DetailsTony Young
Gim Phone #: ###-####
BLD-Blower Door Test Results9/4/20199/4/20199/4/2019PDONE
DetailsTony Young
Tim Phone #: ###-####/// 1.6
BLD-Final9/3/20199/3/20199/3/2019PNR
DetailsTony Young
Gim Phone #: ###-####
BLD-Final8/27/20198/28/20198/28/2019AFAIL
DetailsTony Young
Call to meet // Tim Phone #: ###-####,, c/n posted,, guardrail openings, firewall, smoke detector, blower door test, address posted visible from Twilight, window fall protection, plans, etc
PubWorks Occupancy Approval8/21/20198/21/20198/21/2019 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
CHANGE STATUS TO (ISS)  8/15/2019 DONE
change to ISS- plan mod
OVERRIDE  8/14/2019  
Plan assigned to (BJM)7/24/20197/24/20198/14/2019 DONE
DetailsBrian McGowan
08/05- Check for Planning Approval- Plan Modification for Landscape stairs
Permit Ready to Issue  8/14/2019 DONE
plan mod-please do not re issue
Routing - PLANNING7/30/2019 8/12/2019 PASS
DetailsLeon Letson
Modified Landscape stairs
Routing - PLAN CHECK7/29/2019 8/9/2019 PASS
DetailsBrian McGowan
Routing PW Grading-Hillside7/30/2019 8/5/2019 PASS
DetailsMelissa Jannusch
PLAN MOD approved.A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Routing - FIRE7/30/20197/30/20197/31/2019 PASS
DetailsLee G Meredith
Landscape stairs modified.

No changes required. LGM
Routing - PUBLIC WORKS7/30/2019 7/30/2019 PASS
DetailsMorgan Webb
Grading and Drainage
Plan assigned to (CJW)7/24/20197/24/20197/24/2019 DEFR
DetailsCarl Westfall
Plan Modification Accepted  7/24/2019 DONE
plan mod-changes are to the grading plan-sheets C2.0, C1.0, C2.1-assigned to Carl W
BLD-Other6/10/20196/11/20196/11/2019ADONE
DetailsTony Young
check on soffits,, not called in for inspection,, ok,, verified sheetrock
BLD-Other6/3/20196/4/20196/10/2019ADEFR
DetailsTony Young
need to check on soffits,, not called in for inspection
BLD-Aging Inspection5/30/20195/30/20196/5/2019 PEND
DetailsTony Young
BLD-Energy code compliance1/14/20191/15/20191/15/2019APASS
DetailsTony Young
Tim Phone #: ###-####
BLD-Framing/Rough-in1/11/20191/14/20191/14/2019ANR
DetailsTony Young
Tim Phone #: ###-####,, still needing plate lines sealed up
BLD-Framing/Rough-in1/11/20191/11/20191/11/2019PPART
DetailsTony Young
Tim Phone #: ###-####,, need to seal plate lines,, maintain fire blocking
BLD-Other12/4/201812/5/201812/5/2018APART
DetailsTony Young
Tim Phone #: ###-####,, soffit work in progress,, ok
BLD-Framing/Rough-in12/4/201812/4/201812/4/2018PPART
DetailsTony Young
Tim Phone #: ###-####,, needs fire blocking, seal plates.. nail hangers off,, ok to insulate
Plan Modification Accepted  11/30/2018 DONE
New manual j report
Routing - MECHANICAL11/30/2018 11/30/2018 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Foundation7/26/20187/26/20187/26/2018PPART
DetailsTony Young
Need a wall rebar inspection. Phone #: ###-#### Inspection requested via web by Tim Nau, ok to pour/grout walls after completing the rebar
BLD-Footing7/17/20187/18/20187/18/2018PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Tim Nau,, garage footing
BLD-Footing7/17/20187/17/20187/17/2018PPEND
DetailsTony Young
Need inspection on garage footing. MTI performed soil inspection and compaction tests. Hoping to pour at 3pm.
Thanks Phone #: ###-#### Inspection requested via web by Tim Nau/// needs soils approval
PubWorks Subgrade Approval7/17/20187/17/20187/17/2018 DONE
DetailsMelissa Jannusch
Garage Footings. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Foundation6/15/20186/18/20186/18/2018APART
DetailsTony Young
Trying to pour at 10:15. Had inspection set up for last Friday afternoon and this may be a follow up inspection from that. Phone #: ###-#### Inspection requested via web by Tim Nau,, work in progress,, ok
BLD-Foundation6/15/20186/15/20186/15/2018PPART
DetailsTony Young
Tim Phone #: ###-####,, work in progress on main house walls
BLD-Foundation6/15/20186/15/20186/15/2018PCANC
DetailsTony Young
Looking for the latest inspection we can possibly get this afternoon in preparation for a Monday morning pour.
Thanks Phone #: ###-#### >> Inspection requested via web by Tim Nau Inspection cancelled from web by: Tim Nau
BLD-Foundation5/18/20185/18/20185/18/2018PPART
DetailsTony Young
Requesting concrete retaining wall inspection. Phone #: ###-#### Inspection requested via web by Tim Nau,, work in progress,, back retaining wall at the back of the basement,, front stairway to the house walls
BLD-Footing4/27/20184/27/20184/30/2018PPART
DetailsTony Young
Mana Phone #: ###-####,, stair footings,, fcs blocks
BLD-Footing4/18/20184/19/20184/19/2018PPART
DetailsTony Young
Mana Phone #: ###-####,, upper basement footings ok
PubWorks Subgrade Approval4/17/20184/17/20184/17/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  4/4/2018 DONE
Inspection Record Card- Bld  4/4/2018 DONE
Telephone call  4/3/2018 DONE
emailed Rodney that we need the GC information before we can issue the permits
Extend Review Timeline  3/16/2018 DONE
1st Apporved 180 day extension per Adele. See documents
Telephone call  3/9/2018 DONE
Spoke with Rodney letting him know that this permit is going to expire in 12 days.and is welcome to send in for an extension.
Meeting  3/9/2018 DONE
Sent in letter requesting 180 day extension
Expiration Notice2/21/20183/14/20182/21/2018 DONE
DetailsBrittany Hill
OVERRIDE  11/28/2017  
Plan assigned to (CDM)10/22/201710/22/201711/28/2017 PASS
DetailsCarl D Madsen
SFD
Routing - Addressing9/21/2017 11/28/2017 PASS
DetailsCarl D Madsen
signed off per E-plan
Routing - PLAN CHECK11/28/2017 11/28/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  11/28/2017 DONE
Permit Ready to Issue  11/28/2017 DONE
ALL MET NEED
GC FORM (GC IS NO WHERE ON THE APPLICATION AND ARCHITECT APPLIED)
Routing - PLAN CHECK11/22/2017 11/22/2017 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK10/31/2017 11/16/2017 FAIL
DetailsCarl D Madsen
Routing - MECHANICAL11/8/2017 11/13/2017 PASS
DetailsTroy James
Routing PW Grading-Hillside11/8/2017 11/13/2017 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - PUBLIC WORKS11/8/2017 11/8/2017 PASS
DetailsRachael Beierle
Routing PW Grading-Hillside11/2/2017 11/2/2017 FAIL
DetailsMelissa Jannusch
Need to upload revised plans
Routing - PUBLIC WORKS10/31/2017 11/2/2017 PASS
DetailsRachael Beierle
Routing - PLANNING9/21/2017 11/1/2017 PASS
DetailsLeon Letson
Routing - MECHANICAL10/31/2017 10/31/2017 FAIL
DetailsTroy James
Corrections have not been made to the manual j report
Plan assigned to (BJM)9/21/20179/21/201710/22/2017 DEFR
DetailsBrian McGowan
10/11 sfd L2 ePlan
Routing - PLAN CHECK9/21/2017 10/22/2017 FAIL
DetailsCarl D Madsen
1st review completed  10/22/2017 FAIL
Routing PW Grading-Hillside9/21/2017 9/27/2017 FAIL
DetailsMelissa Jannusch
See changemarks in ePlan
Routing - Erosion and Sediment9/21/2017 9/27/2017 PASS
DetailsAndy J. Long
ESC plan approved. Valid stormwater & ESC team designated. Site preparation inspection required prior to excavation.
Routing - FIRE9/26/20179/26/20179/26/2017 PASS
DetailsScott Arellano
Updated plan review report.
Routing - FIRE9/21/20179/21/20179/26/2017 FAIL
DetailsScott Arellano
Attached plan review report to case. Emailed report to applicant.
Routing - MECHANICAL9/21/2017 9/26/2017 FAIL
DetailsTroy James
emailed corrections to building energy
Route to Impact Fee Review9/21/20179/24/20179/22/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PUBLIC WORKS9/21/2017 9/22/2017 PASS
DetailsRachael Beierle
Application received  9/21/2017 DONE
Application submitted via PDS Online on Sep 21 2017 12:04PM
Plans ACCEPTED BY PLAN TECH  9/21/2017 DONE
Intake Approval  9/21/2017 PASS
Recd Pcfee & Taken To Pln CK  9/21/2017 DONE