Second Notice | | 11/4/2019 | 11/25/2019 | | DONE |
|
|
|
mailed 12-2-19
|
First Notice | | 9/29/2019 | 10/25/2019 | | DONE |
|
|
|
mailed 11-1-19
|
FIRE-Final Inspection | 9/18/2019 | 9/18/2019 | 9/19/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Fire Station #6 verified that the opticon functioned. Curt Phone #: ###-####
|
Letter of compliance/Occupancy | | | 9/19/2019 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 9/19/2019 | | DONE |
|
|
|
passed final inspection
|
BLD-Final | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Tell Riley
|
|
|
Curtis Phone #: ###-####//per Jim Sly's notes final is complete and passed when fire/life safety is passed//
|
PubWorks Occupancy Approval | 8/6/2019 | 8/6/2019 | 8/6/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PART |
Jim Sly
|
|
|
Call ahead // Curt Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Fire/ Life signs off perm. and Public Works signs off perm.
|
BLD-Final | 12/27/2018 | 12/28/2018 | 12/28/2018 | P | NR |
Dave Hannah
|
|
|
Curt Phone #: ###-####
|
BLD-Conference | 12/21/2018 | 12/26/2018 | 12/26/2018 | A | PART |
Tony Young
|
|
|
Kurt Phone #: ###-####,, walk through,, needs trades
|
Zoning Approval | 12/21/2018 | 12/21/2018 | 12/21/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00315
|
FIRE-Final Inspection | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PART |
Troy Cobbley
|
|
|
Temp until the fence/gate is installed
curt Phone #: ###-####
|
FIRE-Final Inspection | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | FAIL |
Troy Cobbley
|
|
|
Gate has not been installed yet. I went over the review comments that address the gate.
|
PubWorks Temp Occupancy Appr | 12/13/2018 | 12/13/2018 | 12/13/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Framing/Rough-in | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PART |
Jim Sly
|
|
|
Kurt Phone #: ###-#### All Ok except......C/N.......Rise on stairway is 7 1/2........need 7.
|
Telephone call | | | 9/12/2018 | | DONE |
|
|
|
called Curt Barber. Zoning inspection added to required signatures. will email new inspection card to him.
|
Inspection Record Card- Bld | | | 9/12/2018 | | DONE |
|
|
|
emailed new card with updated required signatured (added zoning) to Curt Barber.
|
Issue PAID IN FULL permit | | | 2/22/2018 | | DONE |
|
|
|
|
Expiration Notice | 2/21/2018 | 3/14/2018 | 2/21/2018 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 1/29/2018 | | DONE |
|
|
|
Called Richard to inform him that the permit is ready to be picked up, we need the GC form, Revised Cert of value and either a reciept or a letter from ACHD about Impact fees.
|
Routing - PUBLIC WORKS | 1/26/2018 | | 1/29/2018 | | PASS |
Morgan Webb
|
|
|
|
OVERRIDE | | | 1/26/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 9/22/2017 | 9/22/2017 | 1/26/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 2nd Rev Comp - 502 Boise River Fence
|
Routing Off Site - STRUCTURAL | 1/23/2018 | | 1/26/2018 | | PASS |
Julie Romig
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/26/2018 | | DONE |
Christina Prado
|
|
|
Need:
ACHD-met
MET
GC
Revised Value
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/26/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/23/2018 | | DONE |
|
|
|
received three copies of response memos, structural calcs, and plan sheet A2.0; taken to Julie R.
|
Telephone call | | | 1/23/2018 | | DONE |
Christina Prado
|
|
|
called courier for pick up to AHJ
|
Routing PW Sewer Design | 1/22/2018 | | 1/22/2018 | | PASS |
Mike Sheppard
|
|
|
Project plans have met sewer requirements
|
Routing - PLAN CHECK | 1/16/2018 | | 1/18/2018 | | PASS |
Julie Romig
|
|
|
Pending structural and public works review
|
Routing Off Site - STRUCTURAL | 12/21/2018 | | 1/18/2018 | | FAIL |
Julie Romig
|
|
|
2nd Review - Plan Review report emailed to architect.
|
Routing - FIRE | 1/17/2018 | 1/17/2018 | 1/17/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case and plans
|
Routing - Design Review | 1/16/2018 | | 1/16/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing PW Sewer Design | 1/11/2018 | | 1/16/2018 | | FAIL |
Mike Sheppard
|
|
|
|
Routing PW Sewer Rating | 12/26/2017 | | 1/16/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PUBLIC WORKS | 12/26/2017 | | 1/16/2018 | | FAIL |
Rachael Beierle
|
|
|
FAIL. SEE MIKE SHEPPARD
|
Routing PW Solid Waste | 1/11/2018 | | 1/12/2018 | | PASS |
Evan Carpenter
|
|
|
|
Plan resubmittals received | | | 12/20/2017 | | DONE |
|
|
|
received architects response, three copies of Suez water flow sheet, Envelope Compliance Cert, structural calcs for mezzanine/covered entry/wash bay, plan sheets 1,2,3,4,5,6, A0.0, A0.1, A1.0, A1.1, A2.0, 3.0, 3.1; taken to Julie Romig
|
Meeting | | | 12/4/2017 | | DONE |
Scott Arellano
|
|
|
Met with Rick George and reviewed the Fire Code plan review report. We discussed options for meeting fire hydrant requirements and the code benenfits of fire sprinklers in the proposed structure. I advised Rick to contact SUEZ water for an accurate estimate on fire hydrant installation costs and to approximate specific hydrant locations on the existing roadway which may qualify for the current project.
|
Route to Impact Fee Review | 11/3/2017 | 11/6/2017 | 11/7/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | | | 11/3/2017 | | FAIL |
Erika Akin
|
|
|
Attached review comments to case and emailed architect
|
1st review completed | | | 11/3/2017 | | DONE |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | | | 11/1/2017 | | FAIL |
Julie Romig
|
|
|
IBC Plan Review Report emailed to Architect/Owner/Contractor.
|
Routing - Design Review | | | 10/6/2017 | | FAIL |
Katelyn Menuge
|
|
|
DRH17-315 Katelyn Corrections Requries, see site plan
|
Routing - Erosion and Sediment | 10/4/2017 | | 10/5/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified stormwater team designated. No ESC site preparation inspection is required. Only one ESC permit is required for both BLD17-03395 & -03396.
|
Routing - PUBLIC WORKS | | | 10/4/2017 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/22/2017 | | 10/4/2017 | | FAIL |
Julie Romig
|
|
|
Structural Plan Review Report emailed to applicant.
|
Routing PW Sewer Design | | | 10/4/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Use existing sewer service if at all possible. If existing service is not used, abandon it and cap it at the main. Tap the new sewer service in as a type "D" per ISPWC using an insert-a-tee connection. Tap and Plug permist required from Boise Public Works 48 hours prior to construction.
|
Routing PW Sewer Rating | | | 10/4/2017 | | FAIL |
Morgan Webb
|
|
|
|
Routing PW Drainage | 9/29/2017 | | 10/3/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 9/27/2017 | | 9/28/2017 | | FAIL |
Evan Carpenter
|
|
|
The solid waste enclosure must have at least 12 feet of unobstructed clearance between gate posts.
There needs to be 50 feet of clearance in front of the enclosure gate to ensure that the dumpster can be serviced properly.
|
Routing PW Environmental | 9/25/2017 | | 9/27/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Street Lights | 9/27/2017 | | 9/27/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING Land Div | 9/22/2017 | | 9/25/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 9/25/2017 | | 9/25/2017 | | PASS |
Doug Chausow
|
|
|
Updated parcel and address to 5100 W Bethel St
|
Telephone call | | | 9/22/2017 | | DONE |
|
|
|
called Action Couriers for pick up to outside engineering
|
Intake Approval | | | 9/21/2017 | | PASS |
|
|
|
Per JG
|
Plans ACCEPTED BY PLAN TECH | | | 9/21/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/21/2017 | | DONE |
|
|
|
|
Application received | | 9/21/2017 | | | |
|
|
|
|