BLD-Aging Inspection | 1/31/2020 | 1/31/2020 | 2/3/2020 | | DONE |
Tell Riley
|
|
|
shows final is complete
|
FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/19/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Fire Station #6 verified that the opticon functioned. Curt Phone #: ###-####
|
BLD-Other | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Tell Riley
|
|
|
wash bay // Kurt Phone #: ###-####//bay is complete per plans//talked with Curt (GC) cross bracing has loosened and he will be by to tighten everything up//project complete//
|
PubWorks Occupancy Approval | 8/6/2019 | 8/6/2019 | 8/6/2019 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Kurt Phone #: ###-####
|
BLD-Footing | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Dave Hannah
|
|
|
Curt Phone #: ###-####
|
Print Occupancy Form | | | 10/24/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/12/2018 | | DONE |
|
|
|
called Curt Barber. Zoning inspection added to required signatures and this permit now will get CO for wash bay at end of project. will email new inspection card to him.
|
Print Occupancy Form | | | 9/12/2018 | | DONE |
|
|
|
emailed new card with updated required signatures (added zoning and occupancy) to Curt Barber.
|
BLD-Foundation | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-#### Dave passed footing....I passed wall.
|
BLD-Foundation | 3/23/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 3/22/2018 | 3/23/2018 | 3/23/2018 | P | NR |
Jim Sly
|
|
|
Eric Phone #: ###-#### Need approved plans on site ..... Special inspection Required? Sub grade soils test Required? Told Concrete Contr. to Find out.
|
Issue PAID IN FULL permit | | | 2/22/2018 | | DONE |
|
|
|
|
Expiration Notice | 2/21/2018 | 3/14/2018 | 2/21/2018 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 1/29/2018 | | DONE |
|
|
|
Called Richard to inform him that the permit is ready to be picked up, we need the GC form, Revised Cert of value and either a reciept or a letter from ACHD about Impact fees.
|
Routing - PUBLIC WORKS | 1/26/2018 | | 1/29/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan assigned to (JAR) | 9/22/2017 | 9/22/2017 | 1/26/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 2nd Rev Comp - 502 Boise River Fence
|
Routing - Design Review | 1/26/2018 | | 1/26/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/26/2018 | | DONE |
Christina Prado
|
|
|
Need;
GC
Revised Value
ACHD-met
|
Routing Off Site - STRUCTURAL | 1/23/2018 | | 1/26/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/23/2018 | | DONE |
|
|
|
received three copies of response memos, structural calcs, and plan sheet A2.0; taken to Julie R.
|
Telephone call | | | 1/23/2018 | | DONE |
|
|
|
called courier for delivery to AHJ
|
Routing PW Sewer Design | 1/22/2018 | | 1/22/2018 | | PASS |
Mike Sheppard
|
|
|
Project plans have met sewer requirements
|
Routing - PLAN CHECK | 1/16/2018 | | 1/18/2018 | | PASS |
Julie Romig
|
|
|
Pending structural and public works
|
Routing Off Site - STRUCTURAL | 1/18/2018 | | 1/18/2018 | | FAIL |
Julie Romig
|
|
|
2nd Review - Plan Review report emailed to architect.
|
Routing PW Sewer Rating | 12/26/2017 | | 1/16/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PUBLIC WORKS | 12/26/2017 | | 1/16/2018 | | FAIL |
Rachael Beierle
|
|
|
FAIL. SEE MIKE SHEPPARD
|
Routing PW Solid Waste | 1/11/2018 | | 1/12/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Environmental | 12/26/2017 | | 1/11/2018 | | PASS |
Rick Christenson
|
|
|
Will be Required to have Discharge Permit Environmental-RWC
|
Routing PW Sewer Design | 1/11/2018 | | 1/11/2018 | | FAIL |
Mike Sheppard
|
|
|
Add Notes to abandon usused sewer service line and sewer main in W Bethel St and to obtain a sewer Plug Permit.
|
Plan resubmittals received | | | 12/20/2017 | | DONE |
|
|
|
received architects response, three copies of Suez water flow sheet, Envelope Compliance Cert, structural calcs for mezzanine/covered entry/wash bay, plan sheets 1,2,3,4,5,6, A0.0, A0.1, A1.0, A1.1, A2.0, 3.0, 3.1; taken to Julie Romig
|
Route to Impact Fee Review | 11/3/2017 | 11/6/2017 | 11/7/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/3/2017 | | DONE |
Julie Romig
|
|
|
|
Routing - FIRE | | | 11/3/2017 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | | | 11/1/2017 | | FAIL |
Julie Romig
|
|
|
IBC Plan Review Report emailed to Architect/Owner/Contractor.
|
Routing - Design Review | | | 10/6/2017 | | FAIL |
Katelyn Menuge
|
|
|
DRH17-0315 Katelyn-Corrections required, see site plan
|
Routing - Erosion and Sediment | 10/4/2017 | | 10/5/2017 | | PASS |
Andy J. Long
|
|
|
Only one ESC permit is required for both BLD17-03395 & -03396. See ESC17-01293
|
Routing Off Site - STRUCTURAL | 9/22/2017 | | 10/4/2017 | | FAIL |
Julie Romig
|
|
|
Structural Plan Review Report emailed to applicant.
|
Routing - PUBLIC WORKS | | | 10/4/2017 | | FAIL |
|
|
|
|
Routing PW Sewer Design | | | 10/4/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Use existing sewer service if at all possible. If existing service is not used, abandon it and cap it at the main. Tap the new sewer service in as a type "D" per ISPWC using an insert-a-tee connection. Tap and Plug permist required from Boise Public Works 48 hours prior to construction.
|
Routing PW Sewer Rating | | | 10/4/2017 | | FAIL |
Morgan Webb
|
|
|
need wash bay details
|
Routing PW Drainage | 9/29/2017 | | 10/3/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 9/27/2017 | | 9/28/2017 | | FAIL |
Evan Carpenter
|
|
|
The solid waste enclosure must have at least 12 feet of unobstructed clearance between gate posts.
There needs to be 50 feet of clearance in front of the enclosure gate to ensure that the dumpster can be serviced properly.
|
Routing PW Environmental | 9/25/2017 | | 9/27/2017 | | FAIL |
Rick Christenson
|
|
|
Need details of wash pad along with showing connection to interceptor and sewer connection of wash pad.
|
Routing PW Street Lights | 9/27/2017 | | 9/27/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING Land Div | 9/22/2017 | | 9/25/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 9/25/2017 | | 9/25/2017 | | PASS |
Doug Chausow
|
|
|
|
Telephone call | | | 9/22/2017 | | DONE |
|
|
|
called Action Couriers for pick up to outside engineering
|
Plans ACCEPTED BY PLAN TECH | | | 9/21/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/21/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/21/2017 | | PASS |
|
|
|
per JG
|
Application received | | 9/21/2017 | | | |
|
|
|
|