Telephone call | | | 1/31/2020 | | DONE |
|
|
|
Antone called wanted permit withdrawn/voided. He said he was not finishing the placement of the home BLD17-0340. That he was selling the parcel as is. I explained that we couldn't void/withdarw the permit because the building permit has had inspections. I told him the fees should have been paid when the building permit was issued but it was not routed to PW so fees were assessed after.
|
BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/12/2019 | | FAIL |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/10/2019 | 12/10/2019 | 12/11/2019 | | FAIL |
Tony Young
|
|
|
|
BLD-Wall Bracing | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PART |
Tony Young
|
|
|
ok to side exterior rim areas after nailing the new rim to sill plate at 6" oc , ok to continue work
|
BLD-Conference | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PART |
Tony Young
|
|
|
ok to side exterior rim areas after nailing the new rim to sill plate at 6" oc , ok to continue work,, told him to clear up the sewer fee due,, no further inspections untill fee is paid
|
Extend Permit 90/180 days | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Tony Young
|
|
|
ok to side exterior rim areas after nailing the new rim to sill plate at 6" oc , ok to continue work
|
BLD-Conference | 6/18/2019 | 6/21/2019 | 6/27/2019 | A | DONE |
Tony Young
|
|
|
complaint of unsecure structure and squatters. Verify structure is secured against entry.// status review// cleaned up and secure
|
BLD-Conference | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | FAIL |
Tony Young
|
|
|
complaint of unsecure structure and squatters. Verify structure is secured against entry.// correction notice to secure the building and property,, notified on c/n that the permit will expire on July 31 if no required progress inspections are called in for..
|
BLD-Conference | 6/13/2019 | 6/13/2019 | 6/17/2019 | P | FAIL |
Tony Young
|
|
|
complaint of unsecure structure and squatters. Verify structure is secured against entry.// still not secured,, need to post c/n next time
|
BLD-Conference | 6/6/2019 | 6/11/2019 | 6/13/2019 | A | PEND |
Tony Young
|
|
|
complaint of unsecure structure and squatters. Verify structure is secured against entry.
|
BLD-Conference | 6/6/2019 | 6/6/2019 | 6/6/2019 | A | FAIL |
Tony Young
|
|
|
complaint of unsecure structure and squatters. Verify structure is secured against entry. posted "do not occupy" red tag on building,, plywood is off of door openings,, also noted that 2 holes were cut through the rear walls on the front building,, construction fence is up
|
BLD-Conference | 6/4/2019 | 6/5/2019 | 6/6/2019 | A | DEFR |
Tony Young
|
|
|
complaint of unsecure structure and squatters. Verify structure is secured against entry.,, out of time
|
Override - Parcel Holds | | | 6/4/2019 | | |
|
|
|
|
BLD-Conference | 12/3/2018 | 12/7/2018 | 12/13/2018 | P | PEND |
Tony Young
|
|
|
Status? no one around, no activity from last visit,, construction fence up in front
|
BLD-Conference | 11/20/2018 | 11/27/2018 | 12/3/2018 | P | PEND |
Tony Young
|
|
|
Status?
|
Override - Parcel Holds | | | 11/20/2018 | | |
|
|
|
|
BLD-Conference | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PEND |
Tony Young
|
|
|
check status// no one around,, house is sitting on foundation,, boarded up,, new apparent new activity
|
BLD-Conference | 10/17/2018 | 10/17/2018 | 10/18/2018 | P | DEFR |
Tony Young
|
|
|
check status
|
BLD-Aging Inspection | 10/11/2018 | 10/11/2018 | 10/17/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/10/2018 | 10/10/2018 | 10/11/2018 | | CANC |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | PART |
Tony Young
|
|
|
floor- Logan Phone #: ###-####,, floor frame ok,, work in progress
|
BLD-Foundation | 4/25/2018 | 4/25/2018 | 4/25/2018 | A | PART |
Tony Young
|
|
|
Logan Phone #: ###-####,, work in progress,, ok
|
BLD-Foundation | 4/24/2018 | 4/24/2018 | 4/25/2018 | P | NR |
Tony Young
|
|
|
Logan Phone #: ###-####
|
BLD-Foundation | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | NR |
Tony Young
|
|
|
Logan Phone #: ###-####
|
BLD-Footing | 4/18/2018 | 4/19/2018 | 4/19/2018 | A | PASS |
Tony Young
|
|
|
plans on front of trailer- Logan Phone #: ###-####
|
BLD-Conference | 3/21/2018 | 3/22/2018 | 3/23/2018 | A | PASS |
Tony Young
|
|
|
status of fence/barrier
|
BLD-Conference | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PASS |
Tony Young
|
|
|
status of fence/barrier,, fence is up on the front of the property
|
BLD-Conference | 3/21/2018 | 3/21/2018 | 3/22/2018 | P | NR |
Tony Young
|
|
|
status of fence/barrier
|
BLD-Conference | 3/15/2018 | 3/21/2018 | 3/21/2018 | A | FAIL |
Tony Young
|
|
|
status of fence/barrier,, not up yet,, called Logan Patten and left a messege that this was the last day for the barrier 5 day notice,, he had called me on March 16th at 10:45 am and told me that they would have the fence up and should be calling for a footing inspection on the 19th,, nothing yet,, he also informed me that they are going to split the property to add more homes when they get central water to it.
|
BLD-Conference | 3/13/2018 | 3/15/2018 | 3/15/2018 | A | FAIL |
Tony Young
|
|
|
status,, posted a 5 day notice to provide a protection barrier around property or raised house,, needs to be done by the end of the day March 21st, 2018
|
BLD-Conference | 3/12/2018 | 3/13/2018 | 3/13/2018 | A | FAIL |
Tony Young
|
|
|
status/// needs barrior around property or homes,, 2nd home needs to be removed,, c/n posted on barrior,, code enforcement will be involved on removal of other structure
|
BLD-Conference | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PEND |
Tony Young
|
|
|
status,, posted a correction notice to provide a protection barrior/fence for raised homes
|
BLD-Conference | 1/11/2018 | 1/16/2018 | 1/17/2018 | P | PEND |
Tony Young
|
|
|
Check status of project.,, footing trailer on site
|
Routing Walk-In (Zoning) | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
Nicolette Womack
|
|
|
Required to have a paved driveway and two paved off-street parking spaces located outside of the required setbacks.
|
Routing Walk-In (BLD) | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/27/2017 | | 10/27/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/27/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/27/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/27/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 10/27/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/27/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 9/22/2017 | 9/22/2017 | 9/22/2017 | A | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 9/22/2017 | | DONE |
Josh Bogle
|
|
|
|
Application received | | 9/22/2017 | | | |
|
|
|
|