Permit Information
Permit NumberBLD17-03435
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 4095 S GEKELER LN
Project NameAce Co
Customer Number 
ePlanReviewYes
Description
(ACE CO) //Plan modification to adjust the new equipment enclosure footprint to the west and increase the size of the new enclosure, to make new equipment enclosure taller in height, to raise the roof in height of the new equipment cover, to remove existing rear window and infill. 5-10-2018 JG// The fire sprinklers used for area. Permit for a 1,040 sq. ft. addition to an existing 22,760 sq. ft. manufacturing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select exterior bearing walls, removal of select roof and wall infill at the south/west corner, removal of select concrete slab, construction of a new 720 sq. ft. pre-engineered metal building, construction of a new 364 sq. ft. pre-engineered metal cover, relocation of equipment, some minor site work, new concrete slab and footings, (2) new ADA accessible parking spaces, electrical work, plumbing work and mechanical work. Note: special inspection is required, see form #310 attached. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  7/27/2018 DONE
Letter of compliance/Occupancy  7/27/2018 DONE
BLD-Final7/26/20187/26/20187/26/2018PPASS
DetailsDave Hannah
Nate Phone #: ###-####
FIRE-Final Inspection7/24/20187/24/20187/24/2018PPASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete.

Nate Phone #: ###-####
Inspection Record Card- Bld  7/18/2018 DONE
CHANGE STATUS TO (ISS)  7/18/2018 DONE
OVERRIDE  6/27/2018  
Route to Impact Fee Review6/26/20186/29/20186/27/2018 PASS
DetailsEric Bilimoria
added 92 sq.ft. in plan modification
Permit Ready to Issue  6/27/2018 DONE
plan mod-DO NOT REISSUE **additional ACHD fees**
OVERRIDE  6/26/2018  
Plan assigned to (JG)4/24/20184/24/20186/26/2018 PASS
DetailsJavier Guzman
1st rev comp, Plan Mod Ace Co ePlan
CHANGE STATUS TO (REV)  6/26/2018 DONE
changed status back to review pending review by impact fee dept for addtional 92 sq.ft. from plan mod
Telephone call  6/26/2018 DONE
called Cheryl Pearse and told her although plans approved, still awaiting impact fee routing for additional square footage from plan mod
Routing - PLAN CHECK6/26/2018 6/26/2018 PASS
DetailsJavier Guzman
Permit Ready to Issue  6/26/2018 DONE
Plan Mod Approved **additional ACHD fees on ACH case**
DO NOT REISSUE
Routing Off Site - STRUCTURAL6/13/2018 6/19/2018 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Chris Holladay
Routing - PLAN CHECK6/13/2018 6/16/2018 FAIL
DetailsJavier Guzman
Routing - Design Review6/13/2018 6/13/2018 PASS
DetailsAndrea Tuning
Meeting  6/1/2018 DONE
Emailed with Austin with ACHD, Ace Co added more sq ft., additional fees due apply. (added on to ACHD Case)
BLD-Conference5/22/20185/23/20185/23/2018APASS
DetailsJim Storey
Nate Phone #: ###-#### stairlanding and main accessable entry same componit cross slopr ok at stair 2%.
Routing Off Site - STRUCTURAL5/10/2018 5/22/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers Dave Haugland
Routing - PLAN CHECK5/10/2018 5/19/2018 FAIL
DetailsJavier Guzman
Routing - FIRE5/10/20185/10/20185/18/2018 PASS
DetailsErika Akin
No change to previous comments
Routing - Design Review5/10/2018 5/14/2018 FAIL
DetailsAndrea Tuning
The applicant should submit a Design Review application to modify the previous DR approval. It appears as though the applicant did start a Design Review application but never completed it. DRH18-00175
Plan Modification Accepted  4/24/2018 DONE
plan mod in e plan accepted-moved ele panels, adjusted footpriongs, raised roof, window changes-sheets to be uploaded for plan mod are A1.11, A2.01, A2.11, A2.12, A2.41, A3.11, A3.12-assigned to plan reviewer JG
Issue PAID IN FULL permit  12/21/2017 DONE
Inspection Record Card- Bld  12/21/2017 DONE
OVERRIDE  12/18/2017  
Plan assigned to (JG)12/15/201712/15/201712/18/2017 PASS
DetailsJavier Guzman
1st rev comp, 10/25 ACE CO ePlan
Permit Ready to Issue  12/18/2017 DONE
Need: ALL MET
Revised value
GC form
RP
Plan assigned to (JG)9/28/20179/28/201712/15/2017 PASS
DetailsJavier Guzman
1st rev comp, 10/25 ACE CO ePlan
Routing - PLAN CHECK12/12/2017 12/15/2017 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/15/2017 DONE
Plan Reviewer's activity  12/15/2017 DONE
DetailsJavier Guzman
waiting on AHJ engineers to resolve changemarks
Routing - PLAN CHECK11/16/2017 11/30/2017 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL11/16/2017 11/30/2017 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Dave Haugland
Routing - FIRE11/16/201711/16/201711/28/2017 PASS
DetailsErika Akin
Attached comments to case
Route to Impact Fee Review10/30/201711/2/201711/1/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  10/30/2017 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL9/28/2017 10/30/2017 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers Dave Haugland
Routing - PLAN CHECK9/28/2017 10/30/2017 FAIL
DetailsJavier Guzman
Routing - FIRE9/28/20179/28/201710/5/2017 FAIL
DetailsScott Arellano
Attached comments to case and emailed architect
Routing PW Environmental9/28/2017 10/3/2017 PASS
DetailsRick Christenson
Routing - Erosion and Sediment9/28/2017 10/2/2017 PASS
DetailsAndy J. Long
ESC plan waiver approved. Need to designate certified RP for project.
Routing - Design Review9/28/2017 9/28/2017 PASS
DetailsAndrea Tuning
Routing PW Street Lights9/28/2017 9/28/2017 PASS
DetailsTom Marshall
Routing PW Drainage9/28/2017 9/28/2017 PASS
DetailsBrian Murphy
Routing - MECHANICAL9/28/2017 9/28/2017 PASS
DetailsTroy James
Mechanical to be field verified.
Routing - Addressing9/28/2017 9/28/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/28/2017 9/28/2017 PASS
DetailsRachael Beierle
Intake Approval  9/28/2017 PASS
Intake Approval  9/27/2017 FAIL
Door style and hardware and planning letters
Intake Approval  9/26/2017 FAIL
Please upload the completed form 502 checklist with all applicable items.
The special inspection startup form is required to be signed by the owner.
Application received  9/25/2017 DONE
Application submitted via PDS Online on Sep 25 2017 12:56PM