DOC - Permit Finaled | | | 7/27/2018 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 7/27/2018 | | DONE |
|
|
|
|
BLD-Final | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
FIRE-Final Inspection | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete.
Nate Phone #: ###-####
|
Inspection Record Card- Bld | | | 7/18/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/18/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/27/2018 | | |
|
|
|
|
Route to Impact Fee Review | 6/26/2018 | 6/29/2018 | 6/27/2018 | | PASS |
Eric Bilimoria
|
|
|
added 92 sq.ft. in plan modification
|
Permit Ready to Issue | | | 6/27/2018 | | DONE |
|
|
|
plan mod-DO NOT REISSUE **additional ACHD fees**
|
OVERRIDE | | | 6/26/2018 | | |
|
|
|
|
Plan assigned to (JG) | 4/24/2018 | 4/24/2018 | 6/26/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan Mod Ace Co ePlan
|
CHANGE STATUS TO (REV) | | | 6/26/2018 | | DONE |
|
|
|
changed status back to review pending review by impact fee dept for addtional 92 sq.ft. from plan mod
|
Telephone call | | | 6/26/2018 | | DONE |
|
|
|
called Cheryl Pearse and told her although plans approved, still awaiting impact fee routing for additional square footage from plan mod
|
Routing - PLAN CHECK | 6/26/2018 | | 6/26/2018 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 6/26/2018 | | DONE |
|
|
|
Plan Mod Approved **additional ACHD fees on ACH case**
DO NOT REISSUE
|
Routing Off Site - STRUCTURAL | 6/13/2018 | | 6/19/2018 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Chris Holladay
|
Routing - PLAN CHECK | 6/13/2018 | | 6/16/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Design Review | 6/13/2018 | | 6/13/2018 | | PASS |
Andrea Tuning
|
|
|
|
Meeting | | | 6/1/2018 | | DONE |
|
|
|
Emailed with Austin with ACHD, Ace Co added more sq ft., additional fees due apply. (added on to ACHD Case)
|
BLD-Conference | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-#### stairlanding and main accessable entry same componit cross slopr ok at stair 2%.
|
Routing Off Site - STRUCTURAL | 5/10/2018 | | 5/22/2018 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - PLAN CHECK | 5/10/2018 | | 5/19/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 5/10/2018 | 5/10/2018 | 5/18/2018 | | PASS |
Erika Akin
|
|
|
No change to previous comments
|
Routing - Design Review | 5/10/2018 | | 5/14/2018 | | FAIL |
Andrea Tuning
|
|
|
The applicant should submit a Design Review application to modify the previous DR approval. It appears as though the applicant did start a Design Review application but never completed it. DRH18-00175
|
Plan Modification Accepted | | | 4/24/2018 | | DONE |
|
|
|
plan mod in e plan accepted-moved ele panels, adjusted footpriongs, raised roof, window changes-sheets to be uploaded for plan mod are A1.11, A2.01, A2.11, A2.12, A2.41, A3.11, A3.12-assigned to plan reviewer JG
|
Issue PAID IN FULL permit | | | 12/21/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/18/2017 | | |
|
|
|
|
Plan assigned to (JG) | 12/15/2017 | 12/15/2017 | 12/18/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 10/25 ACE CO ePlan
|
Permit Ready to Issue | | | 12/18/2017 | | DONE |
|
|
|
Need: ALL MET
Revised value
GC form
RP
|
Plan assigned to (JG) | 9/28/2017 | 9/28/2017 | 12/15/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 10/25 ACE CO ePlan
|
Routing - PLAN CHECK | 12/12/2017 | | 12/15/2017 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2017 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 12/15/2017 | | DONE |
Javier Guzman
|
|
|
waiting on AHJ engineers to resolve changemarks
|
Routing - PLAN CHECK | 11/16/2017 | | 11/30/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 11/16/2017 | | 11/30/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Dave Haugland
|
Routing - FIRE | 11/16/2017 | 11/16/2017 | 11/28/2017 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Route to Impact Fee Review | 10/30/2017 | 11/2/2017 | 11/1/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/30/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 9/28/2017 | | 10/30/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - PLAN CHECK | 9/28/2017 | | 10/30/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 9/28/2017 | 9/28/2017 | 10/5/2017 | | FAIL |
Scott Arellano
|
|
|
Attached comments to case and emailed architect
|
Routing PW Environmental | 9/28/2017 | | 10/3/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - Erosion and Sediment | 9/28/2017 | | 10/2/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Need to designate certified RP for project.
|
Routing - Design Review | 9/28/2017 | | 9/28/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Street Lights | 9/28/2017 | | 9/28/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 9/28/2017 | | 9/28/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - MECHANICAL | 9/28/2017 | | 9/28/2017 | | PASS |
Troy James
|
|
|
Mechanical to be field verified.
|
Routing - Addressing | 9/28/2017 | | 9/28/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/28/2017 | | 9/28/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 9/28/2017 | | PASS |
|
|
|
|
Intake Approval | | | 9/27/2017 | | FAIL |
|
|
|
Door style and hardware and planning letters
|
Intake Approval | | | 9/26/2017 | | FAIL |
|
|
|
Please upload the completed form 502 checklist with all applicable items.
The special inspection startup form is required to be signed by the owner.
|
Application received | | | 9/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 25 2017 12:56PM
|