FIRE-Final Inspection | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
tim Phone #: ###-####
|
BLD-Final | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | NR |
Jim Sly
|
|
|
Tim Phone #: ###-#### As an observation......Need fire/life final and noticed landing for 36 inch door needed.
|
BLD-Foundation | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | PASS |
Mike Jordan
|
|
|
(mud at 9) Zach Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/9/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/9/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 11/8/2017 | | |
|
|
|
|
Plan assigned to (JG) | 10/6/2017 | 10/6/2017 | 11/8/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 10/26 NxEdge Addition ePlan pend eng
|
Routing Off Site - STRUCTURAL | 11/2/2017 | | 11/8/2017 | | PASS |
Javier Guzman
|
|
|
signe off in ePlan by AHJ Engineers Chris Holladay
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2017 | | DONE |
|
|
|
NEED
GC -Met
RP -Met
Rev Cert of Val- Met
|
Routing - PLAN CHECK | 11/2/2017 | | 11/4/2017 | | PASS |
Javier Guzman
|
|
|
|
Route to Impact Fee Review | 10/27/2017 | 10/30/2017 | 10/27/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 10/6/2017 | | 10/27/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 10/27/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 10/6/2017 | | 10/26/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Chris Holladay
|
Routing - FIRE | 10/6/2017 | 10/6/2017 | 10/16/2017 | | PASS |
Scott Arellano
|
|
|
Attached review comments to case
|
Routing - MECHANICAL | 10/6/2017 | | 10/12/2017 | | PASS |
Troy James
|
|
|
No mechanical plans
|
Routing - Erosion and Sediment | 10/6/2017 | | 10/11/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. RP to be designated.
|
Routing PW Environmental | 10/6/2017 | | 10/11/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLUMBING | 10/6/2017 | | 10/9/2017 | | PASS |
Bill VanDegrift
|
|
|
No plumbing review required.
|
Intake Approval | | | 10/6/2017 | | PASS |
|
|
|
|
Routing PW Drainage | 10/6/2017 | | 10/6/2017 | | PASS |
Brian Murphy
|
|
|
less than 1000 sq ft
|
Routing - PLANNING | 10/6/2017 | | 10/6/2017 | | PASS |
Katelyn Menuge
|
|
|
Approved by Design Review
|
Routing - Addressing | 10/6/2017 | | 10/6/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/6/2017 | | 10/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 10/6/2017 | | 10/6/2017 | | PASS |
Katelyn Menuge
|
|
|
CZC17-00225
|
Intake Approval | | | 10/3/2017 | | FAIL |
|
|
|
Please provide the owners signature on the special inspection form 310
All plan sheets are required to be a minimum 18 x 24 with the required city stamping area in the lower right hand corner of the sheet. Please review the submittal standard for the size and location of the stamping area.
Upload any required planning and zoning approval letters.
Indicate the type of heating to be installed and provide a heating equipment schedule.
Please provide an ESC plan or a plan waiver request letter.
Provide a grading and drainage plan or documentation that it is not required from public works.
|
Application received | | | 9/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 25 2017 3:53PM
|