BLD-Final | 7/19/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 7/19/2018 | 7/19/2018 | 7/19/2018 | A | DONE |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 3.5
|
BLD-Final | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
PubWorks Occupancy Approval | 7/17/2018 | 7/17/2018 | 7/17/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 4/16/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/12/2018 | 4/16/2018 | 4/16/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Wall Bracing | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PASS |
Jim Storey
|
|
|
Fausto Phone #: ###-#### need hd east window living rm.
|
BLD-Other | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PASS |
Jim Storey
|
|
|
Fausto Phone #: ###-#### soffit ok all but back deck ceilling
|
Plan assigned to (M_H) | 1/31/2018 | | 2/2/2018 | | CANC |
Michael Hanson
|
|
|
Plan Mod cancelled, status changed back to ISS
|
CHANGE STATUS TO (ISS) | | | 2/2/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod cancelled, status changed back to ISS
|
Telephone call | | | 1/31/2018 | | DONE |
|
|
|
i accidently signed off on a couple of tasks that i shouldn't have. I've talked to Josh with Hardrock and we're taking care of the issue. He will email me the docs to upload so we don't have to fail the intake
|
Plan Modification Accepted | | | 1/31/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod to change from slab patio to deck
|
BLD-Foundation | 12/11/2017 | 12/11/2017 | 12/11/2017 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 12/4/2017 | 12/4/2017 | 12/5/2017 | P | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 11/30/2017 | 12/1/2017 | 12/1/2017 | P | CANC |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 11/30/2017 | 11/30/2017 | 11/30/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/16/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/16/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 11/15/2017 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/15/2017 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 10/25/2017 | | 11/14/2017 | | DONE |
Michael Hanson
|
|
|
10/17 sfd L2 ePlan - 1st review completed sent back to applicant failed pw hillside and needs grading and drainage foundation info on foundation plan. 10/26 MDH
|
Routing - PLAN CHECK | 10/26/2017 | | 11/14/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 11/9/2017 | | 11/9/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing PW Grading-Hillside | 11/3/2017 | | 11/6/2017 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing - PUBLIC WORKS | 11/3/2017 | | 11/3/2017 | | PASS |
Rachael Beierle
|
|
|
|
1st review completed | | | 10/26/2017 | | FAIL |
Michael Hanson
|
|
|
Needs grading and drainage foundation info denoted on faoundation plan. MDH
|
Routing - PLAN CHECK | 9/27/2017 | | 10/26/2017 | | FAIL |
Brian McGowan
|
|
|
Needs grading and drainage foundation info denoted on foundation plan. MDH
|
Routing - MECHANICAL | 10/2/2017 | | 10/2/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/27/2017 | 9/30/2017 | 9/28/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 9/27/2017 | | 9/28/2017 | | FAIL |
Troy James
|
|
|
emailed correction to ultimate heating
|
Plan assigned to (BJM) | 9/27/2017 | 9/27/2017 | 9/27/2017 | | DEFR |
Brian McGowan
|
|
|
10/17 sfd L2 ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 9/27/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/27/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/27/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 9/27/2017 | | 9/27/2017 | | PASS |
Sue Cummings
|
|
|
In WUI zone. Driveway can't be more than 33 ft wide in front setback (I measure 34 ft.)
|
Routing - Addressing | 9/27/2017 | | 9/27/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/27/2017 | | 9/27/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Sewer Rating | 9/27/2017 | | 9/27/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 9/27/2017 | | 9/27/2017 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Application received | | | 9/26/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 26 2017 7:51AM
|